Laserfiche WebLink
<br />The project site plan is proposing ornamental street lighting throughout the development. <br />These fixtures would be the same as the School District property. As indicated to the <br />School District, NSP has a limited number of lighting standard designs. lfthe applicant <br />chooses one of the standard fixtures and poles, NSP will provide maintenance for the <br />street lights. If they choose light fixtures in standards that NSP does not work with, a <br />homeowners association will be responsible for street light maintenance. <br /> <br />Project Maintenance ~ Homeowners Association <br /> <br />It is proposed that the townhome neighborhood for the project will have a homeowners <br />association. Once the project is completed, the association will be governed by a board <br />elected trom people living in the neighborhood. Association fees will be levied against the <br />members of that association for ongoing maintenance responsibilities. Again, these areas <br />of responsible for maintenance will include the entry island maintenance, private open <br />space maintenance, monuments, if necessary street light maintenance, and other amenities <br />not typically found in developments. Homeowners Association documents must be filed <br />with Ramsey County. <br /> <br />Sidewalks <br /> <br />The School District project is extending sidewalks north to the connection with the <br />Harstad property. The connecting road through the Harstad project should also include a <br />sidewalk to connect that neighborhood and the future connection to Western Avenue to <br />the park <br /> <br />Park Dedication <br /> <br />Harstad Homes has presented the concept of the Townhomes of Lake Owasso planned <br />unit development to the Parks Commission. The Commission's recommendation for park <br />dedication in this matter has been cash in lieu ofland. <br /> <br />Pipeline Setback <br /> <br />An Amoco underground pipeline exists along the northern edge ofthis property within a <br />50 foot pipeline easement. This easement currently defines building setback requirements, <br />although the Pipeline Safety Advisory Task Force has recommended a building setback <br />that would be 100 feet from the pipeline. This recommendation is under consideration by <br />the City Council with action expected in April or May ofthis year. The developer <br />understands that a recommendation in this area is pending and has tried to be respectful of <br />these concerns in the site plan. As the cross sections indicate, there are 12 units that back <br />onto the pipeline easement. All of these units are planned to be located well above the <br />elevation of the pipeline. The closest unit would be 74 feet from the pipeline, moving <br />back to 80 feet away from the pipeline. While this is well in excess ofthe 50 foot pipeline <br />easement setback, it may be short of a pending ordinance defining setbacks from the <br />pipeline. The developer feels this is offset by the grades in this area which) in the event of <br />a pipeline break, would carry liquid product down hill away from the townhome units into <br />the ditch by the railroad. <br /> <br />~ <br /> <br />3 <br />