Laserfiche WebLink
<br />IJJ <br /> <br />. <br /> <br />! <br />:1 <br />I <br />~ <br />I <br />~ <br />~ <br />~ <br />u <br />o <br />o <br />n <br />] <br />] <br />] <br />) <br />] <br />) <br />) <br /> <br />-~ <br /> <br />Introduction <br /> <br />Roseville School District 623 (lithe District") solicited proposals from developers to acquire and <br />develop 76.5 acres near Lake Owasso in the City of RoseviUe. The land was originally <br />purchased as a site for a second high school. Recent analysis and planning by the District has <br />concluded that this land is surplus and should be sold. <br /> <br />In addition to selling the raw land to a developer, the District is also interested in analyzing the <br />potential of developing the lots themselves and selling "developed" lots through potential <br />builders and realizing the development profit. <br /> <br />Springsted Incorporated was hired by the District to assist them and their Consultant - <br />Dahlgren, Shardlow, and Uban, Inc,! in comparing the two alternatives. <br /> <br />Throughout this analysis there is reference to low, high and targeted assumptions. This is an <br />attempt to establish low-cost and high-cost benchmarks to be used in developing the targeted <br />assumptions used as the basis for this analysis. <br /> <br />These benchmarks in no way attempt to define the absolute outer parameters of the associated <br />costs. The benchmarks represent a reasonable estimate of the potential range of costs based <br />on the development program currently being contemplated by the District. <br /> <br />Development Concept <br /> <br />The goal of the District is to have the site developed as a high quality housing development that <br />offers a range of density and housing types that enhance the area and fit on the site, while <br />preserving and enhancing the natural features of the site to the maximum extent possible, <br /> <br />A series of preliminary concept plans were prepared for the site by Dahlgren, Shardlow, and <br />Uban, Inc. These preliminary concepts were reviewed during several meetings with the District, <br />City staff, adjacent property owners, and interested neighborhood and community residents, <br />Three alternatives were then presented at two public meetings hosted by the District, and the <br />plans were modified based on the discussions and direction received at these meetings. <br /> <br />The revised development concept which has been used in this analysis is referred to as <br />Concept 82. It includes a total of 197 dwellings with 21 townhomes in the southwestern corner <br />and 76 townhomes in the northern part of the site. It also includes 100 single family Jots, 12,3 <br />acres of park dedication and 10 acres of wetland/open space on the property. <br /> <br />An additional key step in defining the concept was to define the target market to be served. <br />During the process leading up to the Request For Proposals, two market niches were identified <br />as best meeting the needs and objectives of the District and community. These targeted niches <br />include single Jevel townhomes suitable for empty nesters, young seniors, and single <br />professionals, and move~up single family homes over $250,000. <br /> <br />The development concept selected and the potential market to be served are critical to <br />determining the value of the site and the amount of cash received by the District. In addition, it <br />needs to be aesthetically acceptable to the surrounding residents, the District and the City, <br />Typically a concept which provides the most economic benefit is not the most aesthetically <br />acceptable. Conversely, the most aesthetically acceptable design often times does not yield <br />the highest economic return. For this project to be successful, the District needs to arrive at a <br />concept which represents an equitable compromise between economics and aesthetics. <br /> <br />~ SPRINGSTED <br /> <br />Page 1 <br />