My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02726
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2700
>
pf_02726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:06:56 PM
Creation date
12/8/2004 12:38:39 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2726
Planning Files - Type
Planned Unit Development
Address
2660 CIVIC CENTER DR
Applicant
INDEPENDENT SCHOOL DISTRICT
Status
APPROVED
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,. <br /> <br /> <br />SCHOELL & MADSON, INC. <br /> <br />ENGINEERS. SURVEYORS · PLANNERS <br />SOIL TESTING. ENVIRONMENTAL SERVICES <br /> <br />10580 WAYZATA BOULEVARD. SUITE 1 . MINNETONKA, MN 55305-1525 <br />E61E!J 646.7601 · FAX EB12J 64S.9066 <br /> <br />August 28, 1995 <br /> <br />Mr. Lon Aune <br />Assistant City Engineer <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br /> <br />Subject: <br /> <br />Owasso Hills <br />Utility Testing <br /> <br />Dear Mr. Aune: <br /> <br />\ <br /> <br />This letter is written verification of the following tests on the sanitary sewer and <br />watermain in the first phase of the Owasso Hills project. The infiltration test on the <br />sanitary sewer and the electrical conductivity, leakage and the bacteria tests on the <br />watermain have been completed satisfactorily. Mr. Tony Thury with the City of <br />Roseville had been present for these tests. <br /> <br />It is my understanding the home builders will be allowed to "hook Up" to the <br />sewer and water services at this time. The defection test on the sanitary sewer will <br />be completed when the manholes are raised for the base course of asphalt and the <br />30-day waiting period is completed. <br /> <br />I have enclosed the bacteria test results. <br /> <br />If you need additional information, please give me a call at 546-7601. <br /> <br />Sincerely, <br /> <br />SCHOELL & MADSON, INC. <br /> <br />~7 <br /> <br />Douglas A. Stahl, P.E. <br /> <br />DAS/cj <br />cc: John Shardlow, DSU <br />Brian Houle, C. W. Houle, Inc. <br /> <br />AFFIRMATIVE ACTION. EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.