<br /> <br />08/11/93 14:00 FAX 612 933 47$6 <br /> <br />ALLAN MECHANICAL ...... EVEREST CON CO. III 0011003 <br /> <br />r('. . 1. <br /> <br />22 June 1993 <br /> <br />EVE~ST CONSTRUCTION . <br />P.O. BOX 130190 ' <br />ROSEVILLE, MN 55113 <br /> <br />AT~ENTION: RICK BAKER <br /> <br />BE; COMPUTYPE <br /> <br />Dear Rick; <br /> <br />We have reviewed the existing facility and determined existinq <br />capacity (see enclosed schedule). We then in~erpulated those <br />oapaci~ites to match the new square foot areas of the proposed <br />facility. In r.viewing the existing equ1pment the five (5) <br />York and four (4) Carrier units are relatively new plus, one <br />(1) lS ton Liebert. The remaining eight (at are 10 year or <br />older and are showing signs of corrosion. <br /> <br />The following is a budget estimate for a new faoility and re~ <br />modeling o'f the exilt.inq facility. <br /> <br />A. New faoility at 205 tons <br /> <br />1. 74 tons with concentric drops X SSO per tan <br />2. 116 tons with duct work X 1,350 per ton <br />3. 15 ton Liebert <br />4. Gas pipirl.Cl <br />5. Flve(5) humidifiers <br />6. Two (2) make-up air units <br />7. Nine (9) PRV's for owners exhaust <br /> <br />= $62,900.00 <br />:.= $156,600~OO <br />.. $30,250.00 <br />... $15,000.00 <br />;;; $13,000.00 <br />.. $lO,OOO~OO <br />= $25,000.00 <br /> <br />$312,7&0.00 <br /> <br />Total <br /> <br />B~ Existing facility at 205 tons, assuming 50 tons we do not <br />touch. <br /> <br />1~ Replaoe or add 155 tons X 1,350 per ton :::i $209,250.00 <br />2. Five (5)' humiaifiers =' $13,000.00 <br />3. Miscellaneou$ exhaust -= $5,000.00 <br />4. Gas piping .. ,2,500.00 <br /> Total $229,750.00 <br /> <br />Alternate 1. Replace unit for unit on 50 tons would oost~ <br />Add ~---$32,500.00. <br /> <br />[: <br />~ <br />t <br /> <br />allan mechanical <br />1020 culligan way <br />minnetonka. mn 55345 (812) 933-4022 <br /> <br />. <br /> <br />Inc. <br /> <br />1 <br />