Laserfiche WebLink
May 2, 2014 <br />Attachment C <br />RE: Sherren- Dellwood Neighborhood <br />Drainage Improvements <br />Dear Resident <br />As you are aware, during extreme rain events, Flooding occurs on your street, as well as in several <br />backyards. City staff has completed an analysis of the storm sewer system to better understand the <br />xi sting drainage and l ocalized Flooding issues. We have also identified improvements to alleviate some <br />of these Flooding cone ems. <br />There are three areas of improvements to be inapt emente d this constmetion season as a part of the street <br />improvement project on Dellwood Street: <br />Undereround storaae Pipes trader Dellwood Street: <br />North of Sherven Street, three 150 foot long rows of 60 -inch diameter pipe will be constmeted under the <br />pavement. Storm water will be retained in this system until the storm sewer pipe drains to a level where it <br />can ace ept more water. The pipes will then drain back into the storm sewer (similar to draining a bath <br />tub.) The pipes will also be perforated, to allow for infiltration into the ground. The cul-de-sac will be <br />modified to allow for an emergency high water overflow to the north. <br />Holding back water will delay the storm water from reaching the system, making the system better able to <br />convey the storm water over a longer period of time and reduce the depth of the street Flooding. <br />Storm sewer extension south of Sherren Street: <br />South of Sherven Street, a single row about 100 feet long af48-inch diameter perforated pipe will be <br />onstmete d trader the pavement. Dtis will provide additional underground storage, as well as provide an <br />outlet to a new 12 -inch diameter pipe that will be extended into the backyard at 2246 Dellwood. A catch <br />basin c onstmeted in the backyard will provide an outlet for stormwater that drains the backyards between <br />Merrill and Dellwood north of Sandhurst. <br />Storm sewer replacement behind 2263/2271 Dellwood. and 1290 Dellwood: <br />There is an existing storm sewer pipe along the back property lines of these properties. Dtis will be <br />replaced with 48 -inch diameter p erforated pipe, to increase pipe storage capacity, as well as allowing for <br />infiltration. An added benefit for infiltration in this area is it will allow the ground above the pipe to <br />eeept water, even during peri ods o f snow, or if idets bee one clogged. The ground above the pipe will <br />be graded to ensure positive drainage to the catch basins, and the final outlet to the north will be cleaned <br />and graded to ensure water can overflow if needed. <br />Please contact me at kristine.ei etas ci.roseville.mn.us or 651-792-7048 if you have any questions or <br />would like to schedde a meeting to discuss the improvements. <br />Sincerely, �// <br />y4r <br />Krisfine Giga, RE. <br />Civil Engineer <br />CC: Marc Cdver, City Engineer <br />2660 Civic Center Drive fi Roseville, Minnesota 55113 <br />651 -792 -ROSE el TDD 651-792-7399 e, v ..ci.roseville.mn.us <br />