Laserfiche WebLink
<br />X. ESTIMATED BODS INCREASE: Initial:O.4- #/day Project: 6.:t- #/day Ultimate: t.?- t/day <br /> <br />Basis for estimate: 2.. 5~ 1'>1 ~ // -- M,~~( rCb~~~-f.;, 5e<..vu. ~~ <br /> <br />XI. NATURE OF AREA TO BE SERVED BY THE PROPOSED SEVER EXTENSION: <br /> <br />(a) Residential: Number of New Homes: 16 <br />Number of Existing Homes: I (ofCI & ie~~) <br />(b) Commercial/Industrial (Describe): -0.- <br /> <br />(c) Other (Describe) <br /> <br />-0- <br /> <br />XII. Yill the proposed sewer project be designed and constructed as described in <br />Standard Ut\lities Specifications prepared by the City Engineers Association of <br />Minnesota? y~.... <br /> <br />X!II.DET~~~INATION AS TO THE NEED FOR AN ENVIRONMENTAL ASSESSMENT VOP~SHEET; <br />(Minnesota Environmental Quality Board Regulation) <br /> <br />Please check as appropriate: <br /> <br />Is the ultimate flov increase 500,000 gallons per day (gpd) or more <br />and is the project service area within a city served either by the <br />Metropolitan Yaste Control Commission (MWCC) or the Yestern Lake <br />Superior Sanitary Sewer District System (VLSSD)? <br /> <br />Is the ultimate flow increase 500,000 gpd or more and is the project <br />service area within a city with a population of 20,000 or more not <br />served by either MVCC or YLSSD? <br /> <br />Is the ultimate flow increase 100,000 gpd or more and is the project <br />service area within a city not served by MYCC or YLSSD with a <br />population less than 20,000 but at least 10,000? <br /> <br />Is the ultimate flow increase 50,000 gpd or 'more and is the project <br />service area within an incorporated city not served by MVCC or <br />YLSSD with a population less than 10,000? <br /> <br />Is the ultimate flow increase 50,000 gpd or more and is the project <br />service area in an unincorporated severed area? <br /> <br />If a yes answer WaS appropriate for any of the above conditions, then the <br />preparation of an BAY js mandatory. Do you anticipate that a draft <br />Environmental Assessment ~orksheet (BAY) will be prepared by the city or <br />county? ~ti Approximate date of completion of EAV <br /> <br />Yes No <br /> <br />" <br /> <br />~ <br /> <br />x <br /> <br />x <br />~ <br /> <br />NO SEYER CONSTRUCTION FOR THE REFERENCED EXTENSION MAY BE UNDERTAKEN UNTIL YOU ARE IN <br />RECEIPT OF THE REQUIRED PERMIT(S) ISSUED BY THIS AGENCY AND AS DEFINED BY LAV UNDER <br />MINNESOTA STATE STATUTE 115.07, SUBDIVISION 3. <br />I,. -,~ <br />-:'''Sig~ed: t)-'r-b-At~" U~ ~(' <br />, (En~er) <br />Printed: .D~t'Y ~c.k.. 3. Pa.'!:!-::r4l <br />- <br /> <br />Reg. No. <br /> <br />Irp/,,.. <br /> <br />Signed: <br /> <br />Title: <br /> <br />(Authorized City Representative) <br /> <br />Printed: <br />