Laserfiche WebLink
<br />t <br />, <br />I <br />:1 <br /> <br />~<~I <br /> <br /> <br /> <br />1\ <br />I <br />'I <br />i <br />I <br />" <br />I <br /> <br />\ <br /> <br /> <br />I <br />I <br />I, <br />I <br />I' <br />I, <br />" <br />I <br /> <br />4.9 The provisions of I-4.1 through I-4.8, inclusive, do <br />not apply to Asbestos, POlychlorinated biphenyls (PCBs), <br />Petroleum, Hazardous Waste or Radioactive Material <br />covered by Paragraph 4.5 of the General Conditions. <br /> <br />5. Availability of Lands for Work, Etc. <br /> <br />The lands upon which the Wo~k is to be performed, rights-of- <br />way and easements for access thereto and other lands <br />designated for use by Contractor in performing the Work are <br />identified in the Contract Documents. All additional lands <br />and access thereto required for temporary construction <br />facilities, construction equipment or storage of materials <br />and equipment to be incorporated in the Work are to be <br />obtained and paid for by contractor. Easements for permanent <br />structures or permanent changes in existing facilities are to <br />be obtained and paid for by Owner unless otherwise provided <br />in the Contract Documents. <br /> <br />6. Interpretations and Addenda <br /> <br />6.1 All questions about the meaning or intent of the Bidding <br />Documents are to be directed to Engineer. <br />Interpretations or clarifications considered necessary <br />by Engineer in response to such questions will be issued <br />by Addenda mailed or delivered to all parties recorded <br />by Engineer as having received the Bidding Documents. <br />Questions received less than ten days prior to the date <br />for opening of Bids may not be answered. Only questions <br />answered by formal written Addenda will be binding. <br />Oral and other interpretations or clarifications will be <br />without legal effect. <br /> <br />6.2 Addenda may also be issued to modify the Bidding <br />Documents as deemed advisable by Owner or Engineer. <br /> <br />7. Bid Security <br />7.1 No bid bond is required. <br />8. Contract Times <br /> <br />The number of days within which, or the dates by which, the <br />Work is to be substantially completed and also completed and <br />ready for final payment (the term "Contract Times" is defined <br />in Paragraph 1.12 of the General conditions) are set forth in <br />.the.-Bid Form and the Agreement (or incorporated therein by <br />reference to the attached Bid Form). <br /> <br />9. Liquidated Damages <br /> <br />Provisions for liquidated damages, if any, are set forth in <br />the Agreement. <br /> <br />0100-5 <br />