<br />agree that as liquidated damages for delay (but not as a <br />penalty) CONTRACTOR shall pay OWNER fifty dollars ($50.00) <br />for each day that expires after the time specified in <br />paragraph 3.1 for substantial Completion until the Work is <br />substantially complete. After Substantial Completion if <br />CONTRACTOR shall neglect, refuse or fail to complete the <br />remaining Work within the time specified in Paragraph 3.1 for <br />completion and readiness for final payment or any proper <br />extension thereof granted by OWNER, CONTRACTOR shall pay <br />OWNER fifty dollars ( $50.00 ) for each day that expires <br />after the time specified in paragraph 3.1 for completion and <br />readiness for final payment. <br /> <br />Article 4. CONTRACT PRICE <br /> <br />OWNER shall pay CONTRACTOR for completion of the Work in <br />accordance with the Contract Documents an amount in current funds <br />equal to the sum of the amounts determined pursuant to Paragraphs <br />4.1 and 4.2 below: <br /> <br />4.1 for all Work other than unit Price Work, a Lump Sum of: <br /> <br />Zero <br /> <br />($ 0.00 <br />Figures <br /> <br />) <br /> <br />(Use Words) <br /> <br />All specific cash allowances are included in the above <br />price and have been computed in accordance with <br />Paragraph 11.8 of the General Conditions: <br /> <br />plus <br /> <br />4.2 for all Unit Price Work, an amount equal to the sum of <br />the established unit price for each separately <br />identified item of unit Price Work times the estimated <br />quantity of that item as indicated in Section 0300 - Bid <br />Form. <br /> <br />As provided in paragraph 11.9 of the General Conditions estimated <br />quantities are not guaranteed, and determinations of actual <br />quantities and classification are to be made by ENGINEER as <br />provided in Paragraph 9.10 of the General Conditions. unit prices <br />have been computed as provided in Paragraph 11.9.2 of the General <br />Conditions. <br /> <br />Article 5. PAYMENT PROCEDURES <br /> <br />CONTRACTOR shall subm~t Applications for Payment in accordance <br />with Article 14 of the General Conditions. Applications for <br />Payment will be processed by ENGINEER as provided in the General <br />Conditions. <br /> <br />0400-2 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />