Laserfiche WebLink
4.0B <br />ACKGROUND <br />4.1City ofRosevilleowns the property at 286County Road C,which has a Comprehensive <br />Plan designation of Park & Open Space(POS) and an identicalzoning classification of <br />Park & Open Space(POS). <br />4.2This request has been prompted by the applicant’s desire to erect the <br />CONDITIONAL USE <br />tower, convey itto the City, and lease space for their telecommunication equipment on <br />and at the base of the tower, which makes the City a potential partner in the application in <br />addition to being the landowner. An initial request originally came before the Planning <br />Commission in October 2009, butthe timing of the request was such that the question of <br />the exact height and location of the facility had not been finally resolved between the <br />various City Departments prior to the public hearing.For this reason, the Planning <br />Commission tabled the item, opting to continue the public hearing at a later date in order <br />to make a recommendation once all of the outstanding issues have been resolved. <br />5.0ITC <br />NFORMATION ECHNOLOGY OMMENTS <br />5.1During staff discussions, Terrence Heiser, Director of Information Technology, explained <br />thatClearwire providesboth fixed (i.e., home) Internet access as well as mobile access. <br />Once their system is deployed in the metro area subscriberswill be able to take their <br />Internet connection with them if they have a notebook computer,and Twin Citians will <br />have another option in addition toQwest DSL or Comcast Cable Modem for Internet <br />access.To accomplish this, Clearwire will need hundreds of sites throughout the <br />metropolitan areain addition to several within Roseville’s boundaries. Current tower <br />owners were contacted firstand,to fill in the holes,Clearwire is exploring the <br />development of new towers, making the question less about whethersuch towers will <br />appear and more about wherethey will be installedand how continuous the wireless <br />network will be. <br />5.2The current communication technology being used by Clearwire is being called Wi- <br />Max”; aWi-Max antenna can cover a radius of .3 to 1.2 miles. Given this coverage it is <br />expected that there will be 7 -9 antenna sites in or around Roseville. Clearwire is specific <br />about the elevation, keeping the antennas about 120' from the ground: in Roseville (and <br />most suburban communities) this creates a challenge since there are very few 10-story <br />buildings to attach antennas. So they need to find free-standing towers. Currently there <br />are 5 free-standing towers in Roseville, but the area around Acorn Park remains a critical <br />void. <br />5.3A 125-foot-towerin the proposed location withinAcorn Parkwould satisfy Clearwire’s <br />minimum height requirementsbut, without the possibility of increasing the height of the <br />pole,such height would most likely preclude other service providers from co-locating on <br />the tower. And although none of the area’s cellular providers indicated to Mr. Heiser an <br />immediate interest in installing transmission equipment in Acorn Park, the current <br />location was selected as a place in which additional providers’ equipment could be <br />installed in the future with minimal marginal impact on the aesthetics or functionality of <br />the surrounding park. <br />PF09-032_RPCA_010610 <br />Page 2of 6 <br /> <br />