Laserfiche WebLink
Roseville Arboretum Restroom Building Project SITE 2 <br />Cost estimate 1-19-09 <br />Site Work <br />Tree Removal868 <br />Top soil stripping300 <br />Excavation/backfill5,986 <br />Soil correction ??10,000 <br />Site Restoration8,449 <br />Pavers/paths3,900 <br />Water Service8,300 <br />Sewer Service12,222 <br />Electrical7,900 <br />Sitework sub-total47,925 <br />Building <br />Footings2,700 <br />Foundation/insul4,000 <br />Floor slab/vap ret3,500 <br />Ext wood stud wall3,652 <br />Ext wall sheathing2,640 <br />Int wood stud walls1,042 <br />Roof trusses4,700 <br />Roof sheathing2,394 <br />Misc wood framing2,000 <br />Asphalt shingles6,500 <br />Pre-fin. met. gutters1,860 <br />Sealants500 <br />Doors/frames/hdwr6,000 <br />Alum doors/frames4,900 <br />Windows (4)3,200 <br />Vents600 <br />Siding and trim5,000 <br />Cultured stone6,235 <br />Roof insulation1,836 <br />Wall Insulation1,177 <br />Wall gyp bd VR4,327 <br />Ceiling gyp bd VR1,375 <br />Floor CT/base5,836 <br />Wall CT3,381 <br />Carpet/base1,140 <br />ACT2,752 <br />Ext Paint1,843 <br />Int Paint992 <br />P-lam counters571 <br />Toilet partitions2,000 <br /> <br />