My WebLink
|
Help
|
About
|
Sign Out
Home
2009-02-03_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2009
>
2009-02-03_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 10:47:37 AM
Creation date
7/18/2014 10:47:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM AMOUNT <br />Arena perimeter repairs/re-landscaping <br />Original landscaping undermining the building foundation $29,000 <br />Auto Cad Upgrades (drawing software program) $ 4,300 <br />Soccer Field Goal Post and Net Replacement $ 9,000 <br />Permanent goals at Langton Lake <br />Replace youth soccer goals <br />Plexiglass Windows Replaced in Park Shelters $ 3,500 <br />Ballfield Infield Maintenance $ 4,000 <br />Ballfield Aglime – various locations $ 2,500 <br />Mulch All Newer Trees ` $ 5,000 <br />Other Athletic Field and Landscaping Upgrades $Value Eng. <br />Amenities Picnic table, grills, $Value Eng. <br />Irrigation System Controllers $Value Eng. <br />TOTAL $ 215,000 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.