My WebLink
|
Help
|
About
|
Sign Out
Home
2009-01-06_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2009
>
2009-01-06_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 11:17:06 AM
Creation date
7/18/2014 11:17:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Arboretum <br />Restroom Facility Cost Estimate <br />11/12/08 <br />Building Construction costs: <br />726-882 s.f. ($200/s.f.) 150,000-175,000 <br />A/E costs @ 10% 20,000 25,000 <br />Site Work: 10,000 15,000 <br />Sanitary Sewer $127 LF (200) 25,400 25,400 <br />1 copper water service $73 LF (200)14,600 14,600 <br />Contingency: 20,000 25,000 <br />Total: $240,000 279,000 <br />Phase 2 <br />Phase 2 Building Construction Costs (2008 prices) <br />726-882 s.f. 150,000-175,000 <br />A/E costs @ 10% 20,000 25,000 <br />Site Work: 10,000 15,000 <br />Contingency: 10,000 15,000 <br />Total: $190,000 230,000 <br />Grand Total $430,000 509,000 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.