My WebLink
|
Help
|
About
|
Sign Out
Home
2012-05-01_PR_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2012
>
2012-05-01_PR_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 11:32:25 AM
Creation date
7/18/2014 11:32:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />Well-Connected Internally and Externally through Transportation and <br />194 <br />Technology Infrastructure <br />195 <br />196 <br />197Existing Work Plan Items: <br />198 <br />199Improve Walkability of Neighborhoods By Continuous Additions of Trails and <br />200Sidewalks(ONGOING – Dale St in 2011; Fairview 2011/12; Acorn Park?)(Long Term) <br />201 <br />202Short Term: <br />203 <br />204Continue to lobby for the Northeast Diagonal transportation corridor. <br />205Establish sustainable funding mechanisms for the replacement of city information <br />206systems, streets, sidewalks, and parking lots. (CIP Task Force) <br />207Develop a build-out plan for existing pathway master plan and parks & rec master plan <br />208pathway components, connect multi-family to bus stops and school crossings (on the <br />209same side of the street as the complex). (Short term/Long term for Departments and CIP.) <br />210Long Term: <br />211Participate in regional transportation planning efforts-to ensure adequate regional <br />212resources are allocated to transit and transportation infrastructure to serve Roseville needs <br />213 <br />214 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.