Laserfiche WebLink
8 <br />Well-Connected Internally and Externally through Transportation and <br />194 <br />Technology Infrastructure <br />195 <br />196 <br />197Existing Work Plan Items: <br />198 <br />199Improve Walkability of Neighborhoods By Continuous Additions of Trails and <br />200Sidewalks(ONGOING – Dale St in 2011; Fairview 2011/12; Acorn Park?)(Long Term) <br />201 <br />202Short Term: <br />203 <br />204Continue to lobby for the Northeast Diagonal transportation corridor. <br />205Establish sustainable funding mechanisms for the replacement of city information <br />206systems, streets, sidewalks, and parking lots. (CIP Task Force) <br />207Develop a build-out plan for existing pathway master plan and parks & rec master plan <br />208pathway components, connect multi-family to bus stops and school crossings (on the <br />209same side of the street as the complex). (Short term/Long term for Departments and CIP.) <br />210Long Term: <br />211Participate in regional transportation planning efforts-to ensure adequate regional <br />212resources are allocated to transit and transportation infrastructure to serve Roseville needs <br />213 <br />214 <br /> <br />