My WebLink
|
Help
|
About
|
Sign Out
Home
2008-09-02_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2008
>
2008-09-02_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 11:50:17 AM
Creation date
7/18/2014 11:47:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br />Final Review Draft August 2008 Page 27 of <br />31 <br />Project Name <br />Description <br />19 <br />Dale Street North <br />The construction of an off-street trail from S. Owasso <br />Blvd to County Road C. <br />20 <br />Dale Street South <br />The construction of an off-street trail from Reservoir <br />Woods Park to Larpenteur Avenue. <br />21 <br />Rice Street <br />Develop an on- road and off-road pathway from <br />I <br />Larpenteur to the north City boundary. . <br />22 <br />Brenner to Langton <br />Develop a pathway connection between Brenner Ave and <br />Connection <br />Langton Lake Park. <br />23 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Lan on Lake. <br />24 <br />Twin Lakes Redevelopment <br />Develop pathway facilities, both on and off road, as a part <br />Area Connections <br />of public street infrastructure project within Twin Lakes <br />Redevelopment area (between Fairview and Cleveland). <br />Provide connection from the redevelopment area into <br />Lan on Lake Park. <br />25 <br />NE Diagonal RR Connection <br />Develop a trail connection between Cleveland Avenue and <br />(Walnut to Co Rd Q <br />Walnut Street along County Road C or along the Railroad <br />ri ht- of way south of County Road C. <br />26 <br />Rosedale to HarMar <br />A light traffic overhead bridge structure across Highway <br />Connection <br />36 and pathway connection between Rosedale and Har <br />May Mall, <br />27 <br />Heinel Drive Connection <br />Develop a pathway connection between S. Owasso Blvd <br />and County Road C along Heinel Drive <br />28 <br />Judith to Iona Connection <br />Develop a pathway connection between Judith Ave and <br />Iona Lane. <br />29 <br />Lovell to Minnesota <br />Develop a pathway connection between Lovell Ave and <br />Connection <br />Minnesota Street. <br />30 <br />Villa Park Connections <br />Develop a pathway connection from Shryer Ave and from <br />Ryan Ave into Villa Park <br />31 <br />Millwood to County Road <br />Develop a pathway connection that creates a link between <br />C2 Link <br />the comer of Millwood and Chatsworth through the <br />Ramse County open space to County Road C2. <br />32 <br />Eustis to St. Croix <br />Develop a pathway connection between Eustis Street and <br />Connection <br />St. Croix Street. <br />33 <br />Cohansey St to HANG <br />Develop a pathway connection between Cohansey Street <br />Connection <br />and HANG. <br />34 <br />Alta Vista Drive <br />Develop a pathway connection along Alta Vista Drive <br />between Larpenteur Avenue and Reservoir Woods Park. <br />City of Roseville Pathway Master Plan <br />Final Review Draft August 2008 Page 27 of <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.