Shrub Collection
<br />$
<br />5,000.00
<br />Lilac Hill
<br />$
<br />10,000.00
<br />...... ......... ......
<br />Native grass collection
<br />...... .. . . ......... ......... .........
<br />$
<br />15,000.00
<br />Pathway improvements
<br />$
<br />25,000.00
<br />P Ar#� ToS I DR9 S
<br />9 � 11R {ttT
<br />1!
<br />CP North
<br />.......
<br />.. ..... ... ... ...... .. ........
<br />...... ..... ... ...... ....... .... .........
<br />Master Plan
<br />$
<br />10,000.00
<br />Natural Resource Restoration
<br />..., . ..... ....
<br />$
<br />........
<br />1053,000.00
<br />......... ......... . ........
<br />. .. ... ....... .
<br />Amenities
<br />...... .........
<br />$
<br />20,000.00:
<br />.........
<br />..... ........ .......... ......
<br />Pathway Improvements
<br />$
<br />50,000.00
<br />Sign Planting areas
<br />$
<br />5,000.00
<br />y u nr
<br />a
<br />CP vitt Bailflelds
<br />Master Plan
<br />..... ....... ...
<br />$
<br />.....
<br />20,000.00
<br />......... .........
<br />.........
<br />Reconstruct 4 fields
<br />..... ....... .... ......... .........
<br />........
<br />$
<br />.... ........
<br />300,000.00
<br />.........
<br />Replace fencing 6 fields
<br />$
<br />600,000.00
<br />Concession Stand
<br />$
<br />300,000A0
<br />Play Eq.
<br />...... ......... ..... .... .........
<br />$
<br />.........
<br />50,000.00
<br />........ .........
<br />........
<br />Irrigation for high use areas ..
<br />...... ......... ..... ..
<br />$ ........
<br />25,000.00
<br />.. .........
<br />Sign Planting area with irrigation
<br />$
<br />20,000.00
<br />Natural Resource Restoration
<br />$
<br />50,000.00
<br />Amenities
<br />....... ......... ..
<br />$ ........
<br />15,000.00
<br />......... .... ....... ..
<br />Bleacher Pads
<br />...... .. ......... ......... .......
<br />$
<br />20,000.00 ........
<br />........
<br />Plaza area
<br />$
<br />25,000.00
<br />Material Bins (2)
<br />$
<br />10,000-no
<br />Equipment Storage Boxes
<br />$
<br />5,000.00
<br />. r
<br />.............. ...................................................................
<br />Concardla :`'
<br />Fencing replacement (Vinyl with mains strip}
<br />... ... ........ ... ......... .........
<br />.........
<br />. $
<br />.... .. .... ........
<br />90,000 00 . ....... ... ...... ..
<br />Sign planting area
<br />$
<br />5,000.00
<br />Material Bin
<br />$
<br />5,000.00
<br />Netting replacement
<br />$
<br />15,000.00
<br />95,1)40 Dt)
<br />Natural Resource Restoration
<br />$
<br />50,000.00
<br />Benches
<br />$
<br />5,000.00
<br />Exergren.Park
<br />Netting at Concession Stand
<br />$
<br />100 000.00 .
<br />Tennis court reconstruct _... _. _...
<br />$
<br />100,000.00
<br />Tennis court Color coat
<br />......... ... .........
<br />$
<br />15,000.00 ........
<br />......... ....... . ... .........
<br />Fencing @ Structure
<br />....... ..... ......... ........
<br />$
<br />......
<br />7,500.00
<br />......... ......... ........
<br />......... ......... .........
<br />Landscaping @ Structure
<br />$
<br />10,000.00
<br />Hockey Boards
<br />$
<br />20,000.00
<br />Volleyball net and court ..
<br />$
<br />7,500.00
<br />......... .... ... ...
<br />........ . ...
<br />Replace fencing with vinyl and maint strips
<br />$
<br />250,000.00
<br />Sign Planting with irrigation
<br />$
<br />15,000.00
<br />Stairs to upper level concession stand
<br />......
<br />$
<br />7,500,00
<br />Material Bin
<br />$
<br />S,aoa.ao
<br />.... .
<br />Equipment Storage Boxes
<br />$ .
<br />1,000.00
<br />....... .......
<br />...
<br />Water Fountain
<br />$
<br />10,000.00
<br />HANG
<br />......... .......
<br />Master Plan
<br />.... ....... .. ........ ......... ... ..... ....... .......
<br />$
<br />50,000.00
<br />.. .........
<br />HANG Carpeting
<br />$
<br />15,000.00
<br />HANG Kitchen Improvements w/ appliances
<br />$
<br />15,000.00
<br />HANG Boardwalk Phase 2 and 3
<br />..... ....... .........
<br />$ .......
<br />400,000.00
<br />......... ....... ... .....
<br />.. ........
<br />Natural Resource Restoration
<br />$
<br />300,000.00
<br />
|