My WebLink
|
Help
|
About
|
Sign Out
Home
2007-04-03_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2007
>
2007-04-03_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 12:36:12 PM
Creation date
7/18/2014 12:33:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) Central Park <br />-implementation of Central Park Master Plan <br />-under road crossings on Victoria and Dale Streets <br />-tennis courts to replace Dale Street courts <br />-hillside seating at Legion field <br />-implementation of Nature Center Master Plan <br />-JC's & Lion's Club shelter replacement -(Lions Shelter completed 1995, JC <br />Shelter completed 2000) <br />-trail improvements <br />-kiosks <br />-batting cage (Completed 2002) <br />-forestry evaluation <br />-erosion control in several locations (South Bennett Lake completed 1996) <br />-turf irrigation system <br />-Dale Street landscaping plan <br />-wading pool in special populations area <br />-basketball courts <br />-2 soccer fields reconstructed (Completed 2002) <br />-camera security system (phase 1 Completed 2002) <br />-educations/interpretive landscape restoration project <br />-kitchen improvements in both shelters (Completed 2002) <br />-boardwalk <br />-Central park Muriel Sahlin master plan development & maintained. <br />-ball field improvements <br />-shelter & utility improvements <br />-tennis court improvements <br />6) Concordia Park <br />-netting project (Completed 2002) <br />-batting cage (Completed 2000) <br />-bard surface around concessions <br />7) Cottontail Park <br />-asphalt trail <br />-improved rest areas <br />-bird houses <br />8) Evergreen Park <br />-fencing for all ball diamonds (Completed 1995) <br />-additional parking (Completed 2000) <br />-dugouts (Completed 2001) <br />-concession building (Completed 2000) <br />-replace warming shelter (Completed 2000) <br />-hockey rink (Completed 1995) <br />-repair tennis courts <br />9) Howard Johnson Park <br />-parking lot <br />-tennis court renovations <br />10) Lady Slipper Park <br />-parking areas <br />-improved canoe landing <br />-floating trail <br />-community gardens <br />-pathway along South Owasso Blvd <br />Roseville Comprehensive Plan -2003 Update Parks and Recreation Page 10 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.