Laserfiche WebLink
25) Villa Park <br />-sliding hill <br />-additional asphalt trails <br />-water slide on hills <br />-basketball court <br />-sand volleyball court <br />-replace shelter <br />-play equipment <br />26) Willow Pond <br />-floating trail from south access <br />-nesting pads <br />-more benches <br />-aerator fountain in pond <br />27) Woodhill Park <br />-swinging benches <br />-landscaping <br />28) Veterans Park <br />-play equipment (Completed 2000) <br />-landscaping <br />-trails <br />-sand volleyball (Completed 1999) <br />-parking lot renovation <br />29) Lake Owasso School site develop youth league ball field complex (Completed 1995) <br />G. Proposed Facility Improvements <br />1) Golf Course <br />-Research and implement where feasible, 1992 Golf Facilities Feasibility <br />Study <br />•Implement Master Plan for: <br />-clubhouse replacement <br />-maintenance building replacement <br />-greens renovation (Completed 1997) <br />•Implement Landscape Master Plan <br />•Improve fencing on #9 fairway <br />2) Ice Arena <br />Complete improvements to locker rooms, concession area, office space, <br />meeting room and storage space (Completed 1998) <br />Convert current direct refrigeration system to indirect system <br />-integrate other recreational facilities into overall site operation <br />Upgrade site landscaping <br />3) John Rose Minnesota OVAL <br />Complete Second Phase Master Plan (Completed 1998) <br />Roseville Comprehensive Plan -2003 Update Parks and Recreation Page 13 of 17 <br />