My WebLink
|
Help
|
About
|
Sign Out
Home
2007-12-04_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2007
>
2007-12-04_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 12:43:06 PM
Creation date
7/18/2014 12:41:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hoisinglun Kopler Mup Inc. MIN <br />IN 1H <br />To: C'crmhre.hensice Plan Stm ing Cnrnmittee <br />From: Iioisingtort Koc�;ItT (.3YO rp ine. <br />Subject: Inhwmation Ar YoVcmher 1iedin, <br />Date: Nnerruhi•r 1, 2007 <br />The details of the mcobg of ?e Roserdtc Comprehensive flan Stce.ring COmmWee are its <br />Mows! <br />Date: Thursday, Novenrlwr 8, 2001 <br />Tirane: 6:001).m. to S:00p.Ill, <br />Location. Rosccdlc. Public: Works Confer race lZor. m (Sarrrc> locutitm Lrs O ioller meering) <br />Agenda: <br />I. Idottsekecping (6:00) <br />• Rf jmv auCnda <br />• <br />Down ground rules Ar public input <br />II. Planning Pros n (6 05) <br />• Roview detailed calendar cif meeting, and w(plonceorf wnrk tasks for planning process <br />III. Organization and Contents of the Comprehen w Plan (6:25) <br />• Review current and hroprised outline for Cornprehc.n,iM' Flan <br />• Obtain Feedback G-om Committee on contents of Plan <br />IT RdathmNp of Vision and CornprchniAm Plan (7:05) <br />• Discuss rclationshilr Iniagine 202S Vision and the Comprehc,nsive Plan <br />V, Wrap LIp (7:50) <br />• Ophurtunity lire public input <br />• Next me:cting <br />As NVe di5CU55Cd at the St mecUng, it is cs.ential that members of the Steering Comiyittcc came prcparcd <br />for each meeting. Vie ask that the Steering Co mnit c commit to: <br />* Carefully rexiew incl meeting expectations and background irl'ormation. <br />• Come, to each nwe*V prepared to discuss anti make de 6sions Anut thr'. aspot`1s of ilte Comprehensive <br />Plan that are hcfirrc the Steering Committee e ch month. <br />• Contaci sta.fl•or I-IKGi tiN ith technical clnestiOWn and ri;yueats hear additional information before- thu <br />rn 00t hs <br />I he r(nnainder of this Ill cnu3l-,Indutti explains the jeohm for this imecting and provides back amnd <br />information fru• your review. <br />I ) 3 \urllr flurIl �t rr.•t, Srfirz- 100, 1\11[11W.11106, %IN i;401 16 i9 <br />111 (612 } 3 18-GXOO ix ill) 43S-6118 rom <br />I.kiccK412;t 252-7120 !:mail 171kncl1ci�h:LLrrn�. <br />OVER <br />
The URL can be used to link to this page
Your browser does not support the video tag.