Laserfiche WebLink
Mr. Schwartz provided an overview of the Public Works Department, which had <br /> originally been put together by staff for the benefit of new commissioners, but <br /> deferred due to other agenda scheduling conflicts. Mr. Schwartz advised that the <br /> information was also periodically updated as part of the "Roseville University" <br /> workshops held for interested citizens over the last few years, with each City <br /> department presenting information to better inform residents about their <br /> community and local government operations. Mr. Schwartz referenced the atlas <br /> pages in hard copy form that had previously been provided to PWETC members, <br /> and encouraged them to ask questions of or provide input to staff at any time. <br /> Mr. Schwartz reviewed the City of Roseville's 13.8 square miles and population <br /> of 33,600, 2014 Public Works Department budget of$19,500,000 and 32 FTE <br /> staff, and its current organizational chart. Mr. Schwartz briefly reviewed each <br /> division and their specific responsibilities: Public Works Administration, <br /> Engineering, Street Maintenance, Utilities, Building and Vehicle Maintenance, <br /> Solid Waste, and Asset Management. <br /> As part of the Street Maintenance Division, Mr. Schwartz included a discussion of <br /> the PMP and street lifecycle applications; 40 city-owned parking lots; and public <br /> owned pathways; in-house preparation by grading and prep work before paving to <br /> reduce costs; and snow plowing and the City's current policy on street plowing <br /> (available at www.cityofroseville.com/snow). <br /> Mr. Schwartz also provided an update on the City's automatic meter reading <br /> (AMR) and replacement of commercial and difficult-to-read meter replacements <br /> begun in 2010 and expectations of meter replacement to be finished in 2016, with <br /> 4,000 installed to-date, with the Finance Department then able to read all meters <br /> city-wide from four data collectors placed throughout the City. Mr. Schwartz <br /> advised that this also allowed more useful data for the City and its customers in <br /> leak detection, promoting efficiency and conservation, decreasing costs of meter <br /> reading and billing times, reliability and better management of staff resources. <br /> Mr. Schwartz advised that 1/3 or more of the City's entire sanitary sewer system <br /> was cleaned annually with a high pressure jet, and in some cases, root cutting; <br /> with 50,000 plus feet of sewer main televised annually to remain proactive in <br /> finding problems and high priority segments. Mr. Schwartz advised that staff had <br /> made significant progress in addressing problem areas, especially when 80% of <br /> the City's pipes were clay tile, and with lining technologies, PVC products could <br /> be used inside those areas where the clay the was failing, with over six miles <br /> accomplished in 2014, seven miles in 2013, and five miles in years prior to that. <br /> Mr. Schwartz noted that grant dollars available from State bonding through the <br /> Metropolitan Council helped the City be able to do more than it could accomplish <br /> on its own financially. <br /> Mr. Schwartz reviewed the City's sanitary sewer back-up cleaning assistance <br /> policy established by the City Council several years ago in an effort to protect the <br /> Page 14 of 18 <br />