My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02782
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2700
>
pf_02782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:10:14 PM
Creation date
12/8/2004 12:41:02 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2782
Planning Files - Type
Planned Unit Development
Address
2555 SNELLING AVE N
Applicant
WESTERN AUTO
PIN
012923110018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />To Mike Falk <br /> <br />From Douglas Strong <br /> <br />L5 <br /> <br />Re Planning File 2782 <br /> <br />Date July 31, 1995 <br /> <br />This file deals with a PUD at 2555 N. Snelling Avenue. The engineering staff has reviewed this proposal and has the <br />following recommendations: <br /> <br />1. The southwesterly parking lot is built on the right-of-way line of Oakcrest Avenue. There is no 15 foot <br />setback. Is there a variance for this? If there isn't, the parking lot needs to be relocated to the north. <br /> <br />2. The drawings show painted islands in the parking lot. These need to have concrete curb and gutter <br />around them with landscaping in them. All of the parking lot needs concrete curb and gutter around it. <br />Those area shown with painted curb need to be replaced with concrete curb and gutter. <br /> <br />3. The landscaping plans have plantings on top of existing and/or proposed utilities. No trees should be <br />placed in those locations. <br /> <br />4. There is an existing utility easement which serves the storm sewer line in the existing parking lot. Part <br />of that existing storm sewer line is proposed to be abandon. That part of the easement must be released. <br />Deadending the storm sewer line must be done as per Roseville's standards. The drainage plans need to <br />be reviewed for proposed additional catch basins. <br /> <br />5. The standard erosion controls need to be in place before grading is started. <br /> <br />6. The sanitary sewer service has a proposed "Sand/Grease" interceptor manhole located off of the <br />northeast corner of the proposed new building. This must be cleaned out weekly or as needed to keep <br />slit out of the city's sewer system. <br /> <br />7. A new driveway opening is proposed off of Oakcrest Avenue. The existing one, to the west ofthis <br />location, must be removed as per Roseville's standards. The curb on both sides of this driveway must <br />be removed as per standards for the sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.