My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02787
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2700
>
pf_02787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:10:26 PM
Creation date
12/8/2004 12:41:15 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2787
Planning Files - Type
Division of Land
Address
1763 ROSELAWN AVE
Applicant
SEIDENKRANZ, ANGELINE
Status
APPROVED
PIN
142923220025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />To Mike Falk <br /> <br />a <br /> <br />From Douglas Strong <br /> <br />Re Planning File 2787 <br /> <br />Date August 21, 1995 <br /> <br />This file deals with a Preliminary and Final Plat on Roselawn Avenue between 1763 and 1805 Roselawn <br />Avenue. The engineering staff has reviewed this proposal and has the following recommendations: <br /> <br />1. This lot was assessed for two lots. If this plat is approved the assessment for the additional lot <br />will have to be paid. The amount is $305.00. <br /> <br />2, The preliminary plat does not have any topography on it. This is required as per city code. <br /> <br />3. The existing curb and gutter will have to be removed for any new driveways. Permits for this <br />work will be required from Ramsey County. The replacement work must meet Ramsey County <br />requirements. <br /> <br />4. There is an existing 20 foot sanitary sewer easement running east/west across this property. No <br />buildings can be placed within the 20 foot easement. Any grading of this area must have city <br />approval before work is started. <br /> <br />5. There is only one water service located at the west end of the proposed plat. Two new water <br />services will have to be constructed to serve the new homes. The City ofRoseville's utility <br />personal must make the new tap on the watermain. <br /> <br />6. The sanitary sewer services must come from the main located within the easement which runs <br />east/west in the easement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.