My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02803
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:11:03 PM
Creation date
12/8/2004 1:18:28 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2803
Planning Files - Type
Planning-Other
Address
2660 CIVIC CENTER DR
Applicant
ST. MARIE SHEET METAL, INC.
Status
APPROVED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STRATEGY 3 <br /> <br />Prevent and correct flooding and drainage problems both in the area and downstream. <br /> <br />Action 3-A <br /> <br />Revise the stormwater detention requirements to comply with new regulations recently <br />adopted by the City. <br /> <br />Action 3-B <br /> <br />Revise the standards to include site design and review standards that encourage on-site <br />management of stormwater where possible, and stormwater conveyance to regional ponds <br />where necessary. For example, some temporary (12 hour) storage could be done in <br />parking lots by controlling flow ITom parking lots to ponds. <br /> <br />Action 3-C Other Suggestions: <br /> <br />STRATEGY 4 <br /> <br />Protect, preserve and restore features, on both public and private property, which significantly <br />contribute to the character and appearance of Tower Place. <br /> <br />Action 4-A <br /> <br />Utilize joint easements and purchase of development rights to preserve open space, <br />parking, street frontages and right-of-ways for railroads and pipelines. <br /> <br />Action 4- B <br /> <br />Utilize easements during the site plan review process to maximize use of existing paved <br />parking and driveways. <br /> <br />Action 4-C <br /> <br />Plant street boul~vard and median areas, consistent with the City Master Tree Plan, as part <br />of each redevelopment project. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.