My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. Installation by Developer. The Developer shall install or cause to be installed and pay <br />for the following: <br /> <br /> <br />A. Street Lights <br />B. Setting of Lot and Block Monuments <br />C. Surveying and Staking of work required to be perfonned by the Developer <br />D. Gas, Electric, Telephone, and Cable Lines <br />E. Site Grading <br />F. Landscaping <br /> <br />2 <br /> <br /> <br />6. Time of Performance. The Developer shall install all required improvements <br />enumerated in Paragraph 5 which will serve the plat by September 1, 1996. The <br />Developer may, however, request an extension of time to the City. If an extension is <br />granted, it shall be conditioned upon udpating the security posted by the Developer to <br />reflect cost increases and the extended completion date. <br /> <br />7. Public Improvements. The following improvements shall be designed and installed in <br />the plat by the Developer: . <br /> <br />A. Sanitary Sewer <br />B. Water <br />C. Stonn Sewer <br />D. Streets <br />E, Sidewalks <br />F. Street Signs <br />G. Retaining Walls <br /> <br />8. Requirements for Public Improvements. All public improvements shall be installed <br />with the approved plans. The plans shall be developed in accordance with City standards, <br />ordinances, and plans and specifications which have been ptepared by a competent, <br />registered, professional engineer. The plans shall beJurnished to the City for all <br />necessary approvals. The Developer shall obtain all necessary pennits from the City~ as <br />well as other agencies, before proceeding with construction. The Developer shall be <br />responsible for providing full-time field inspection personnel to assure an acceptable <br />level of quality control to the extent that the Developer's engineering shall be able to <br />certify that the construction meets the approved City standards as a condition of City <br />acceptance. In addition, the City may, at the City's discretion, and at the Developer's <br />expense, have one or more City inspectors and a soil engineer inspect the work on a full <br />or part-time basis. The Developer or his engineer, shall schedule a pre-construction <br />meeting at a mutually agreeable time at the Roseville Civic Center with all parties <br />concerned, including City staff, to review the program for the construction work. Within <br />30 days of the completion of the improvements and before the security is released, the <br />Developer shall supply the City with a complete set of reproducible as-built plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.