My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />May 2, 1996 <br /> <br />To: Mike Falk, City Planner <br />Jay Kennedy, Assistant Director of Public Works ~ <br /> <br />From: <br /> <br />RE: FRANK TSCHIDA PRELIMINARY AND FINAL PLAT <br /> <br />The Engineering Department has reviewed the above mentioned project. I have the following <br />comments: <br /> <br />3. Stanbridge Circle is currently proposed at an 8% grade. The City Code allows a <br />maximum of a 6% grade. The developer's engineer has indicated that he will attempt to <br />modify the grades in order to meet the 6% standard. As an example, Minnesota Street to <br />the west of Rice Street is a 5.5% grade and Civic Center Drive just north of County Road <br />C is also a 5.5% grade. <br /> <br /> <br />I. Currently, there are no provisions for stormwater detention on the site. In discussions <br />with the developer's engineer, it has been indicated that stormwater detention will be <br />provided on-site. <br /> <br />2. An additional catch basin should be installed on the south side of Stanbridge Circle near <br />the intersection of Farrington Street to collect stormwater rrom the cul-de-sac. <br /> <br />4. There are currently no erosion control provisions shown on the grading plans. These will <br />have to be incorporated into the final grading plan. <br /> <br />If you have any questions or would like to discuss this matter, please contact me at 221. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.