Laserfiche WebLink
<br />are practical difficulties and future development considerations on this site which would allow <br />for the variance to be granted. These include the following: <br /> <br />1. The site is surrounded by public street right-of-way on three sides, one of which (Mount <br />Ridge) may never be built. <br />2. The project is designed to maximize public green space and berming between the right of <br />way and the parking on Cleveland and lona. <br />3. There is a potential need for additional right-of-way or easements from the Ryan site for <br />the future development of Twin Lakes Parkway. Twin Lakes Parkway is intended to be <br />the major entrance into the Twin Lakes Redevelopment area from the west. Additional <br />space may be needed for Twin Lakes entrance monument signs, pedestrian pathways, and <br />other pedestrian amenities. <br />4. The developer is contractually obligated by development agreement with the City to <br />provide 105,000 square feet on the site. <br /> <br />Desip Standards: <br /> <br />One of the issues which was identified at the May 8, 1996 Planning Commission and the May <br />28, 1996 City Council meetings was that this site and the rest of the Twin Lakes Redevelopment <br />area are being held to different and reduced development standards than the Centre Pointe PUD <br />project. The Midwest Motor Express site is zoned 1-2 General Industrial while the Centre Pointe <br />site is zoned B-4 with a PUD for Retail Office Service. Therefore, there are different standards <br />in each district. Some standards are more stringent in the 1-2 zoning district while others are <br />more stringent in the B-4 district. Staffhas attached a chart showing the differences of the major <br />current standards which apply in each district and how Ryan's proposal compares. All other <br />current zoning standards are the same in each district. Ryan's proposal meets or exceeds all <br />current standards in each district with the exception of the 0 foot parking setback on the east side <br />of the property. <br /> <br />It should be noted, however, that the B-4 standards which were in place when the Centre Pointe <br />project was approved where different than current standards. The main differences were that <br />brick or architecturally treated concrete were required as exterior materials and that a special use <br />permit for site plan approval was required. The B-4 standards were amended in 1991 when the <br />City adopted the design standards which now apply to all business and industrial zoning districts. <br /> <br />Eniineerine Considerations: <br /> <br />The Engineering Department has reviewed the above mentioned project. The following is a list <br />of concerns: <br /> <br />1) BR W and the City staff are currently in the process of performing a feasibility study in <br />order to solve two issues regarding the Twin Lakes area. <br /> <br />4 <br />