Laserfiche WebLink
<br />Ac.-I f t1A: <br /> <br />City of Roseville <br />Community Development Department <br /> <br />Memo <br />J an 17, 1996 <br /> <br />TO: Steve Sarkozy, City Manager <br /> <br />FROM: Dennis Welsch, Community Development Director (490-2232) <br /> <br />RE: ACI Fence Extension.... UPDATE FROM JAN 10. MEMO <br /> <br />In the past two weeks, Mike Falk and I met with the contractor for the original fence, Keller <br />Fence (Tim Dyrhaug, 646-5404). He is preparing a detailed quotation for the city. The fence can <br />be installed only when the ITost is out of the ground. Tim estimates that this will be in late March <br />or early April. The cost estimate should be here next week for staff and Council review. <br /> <br />Today I received a call ITom Jill Tudisco (636-8620), a neighbor of the original contact, Lisa.. <br />Ms. Tudisco said she had noticed increased noise ITom the loading doors as well as the new roof <br />top machinery installed in December. She has alerted ACI to the noise issues and will ask for a <br />noise buffer. ACI says the noise buffer is already in place. It may be misplaced for Ms. Tudisco <br />who says the noise is worse and the loading docks are really bothersome at 3: OOam. <br /> <br />Our inspectors are spending Jan. 10 through Jan 12 at the annual state building inspection <br />seminars. We will send an inspector out to review the machinery and the noise on Friday, January <br />12th or Tuesday the 16th. <br /> <br />UPDATE 1/17/96: Today our inspector (Bob R.) talked with Dan McCarthy at AC.I. and asked <br />what new equipment had been placed on the roof. McCarthy said nothing had been placed on the <br />roof. Dan said ACI is attempting to muffle the sound ITom the metal dock loading plates (3) by <br />adding foam now and a rubberized surface on the dock plates as soon as the temperature gets <br />consistently above 40 degrees, probably in March. <br /> <br />1 <br />