My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02867
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:17:50 PM
Creation date
12/8/2004 1:22:38 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2867
Planning Files - Type
Comprehensive Plan Amendment
Address
2660 CIVIC CENTER DR
Applicant
COMPREHENSIVE PLAN/TWIN LAK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />'I.~ <br />~ <br /> <br />B R W INC. <br /> <br />Planning <br />Transportation <br />Engineering <br />Lrban Design <br /> <br />Thresher Square <br />700 Third Street So. <br /> <br />Minneapolis, <br />M:'\ 55415 <br /> <br />612/37(].()700 <br />Fax 612/370-1378 <br /> <br />Den\'er <br /> <br />Milwaukee <br /> <br />Minneapolis <br /> <br />Newark <br /> <br />Orlando <br /> <br />Phoenix <br /> <br />Portland <br /> <br />San Diego <br />SeattJe <br /> <br />t v<<fL j <br /> <br />July 3, 1997 <br /> <br />Mr. Jay Kennedy <br />City of Roseville <br />2660 Civic Center Dr. <br />Roseville, MN 55113 <br /> <br />RE: Twin Lakes Regional Pond <br />Trunk Stonn Sewer Design Calculations <br /> <br />Dear Mr. Kennedy: <br /> <br />Enclosed are the stonn sewer design calculations for the proposed northern and southern <br />trunk stonn sewers as detailed in the comprehensive plan amendment. The area map <br />provided indicates drainage areas and maximum stonn water flow to be generated from <br />the area based on a 10 year frequency stonn event. Areas are given in acres. <br /> <br />The flow rates, in cubic feet per second, are annotated to indicate the structure intended <br />to pick up the runoff. For example, Q6=11.4 indicates that a flow of 11.4 cfs is generated <br />from the area and picked up by structure 6. <br /> <br />Also included are the spread sheets showing the calculations for each run of storm sewer. <br />There are separate spread sheets for the northern and southern trunks respectively. The <br />MH/CB numbers on the spread sheets correlate to the numbers assigned to the structures <br />on the area map. <br /> <br />If you have any questions please give me a call. <br /> <br />Sincerely, <br /> <br /> <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.