Laserfiche WebLink
<br />No additional remediation or investigation was deemed necessary by the MPCA. <br /> <br />3. Remediation Work Plan Implementation Report for Tract A, Twin Lakes Development, 2720 <br />Arthur Street (Twin Lakes Corporate Center), Volumes I-VI, B.A. Liesch Associates, Inc. <br />February 1995 <br /> <br />Volume I: <br />V olume II: <br />Volume III: <br />Volume N: <br />Volume V: <br /> <br />Volume VI: <br /> <br />Previous work: <br /> <br />Report and Appendix A and B (report graphics and testing results) <br />Appendix C (Soil Laboratory Testing Data sheets) <br />Appendix D (McCrossan Manifestation and Post-Burn results) <br />(cont. from Vol. III) <br />Appendix E - G (USPCI Manifestation, Off-Site Fill Material Manifestation, and WRA <br />Manifestation) <br />Appendix H-L (Debris Manifestation, MCWS Permit and Monthly Reports, <br />Groundwater monitoring well installation data and sampling results, drum disposal waste <br />profile form, and proposed gas venting system drawings) <br /> <br />"Soil Risk Assessment, Tract A - Ryan Twin Lakes", prepared by B.A. Liesch, June 22, <br />1994 <br /> <br />"Remediation Work Plan, Tract A - Twin Lakes Development", prepared by B.A. <br />Liesch, July 12, 1994 and August 5, 1994 <br /> <br />"Amendment of September 30, 1994 to Remediation Work Plan, Tract A - Twin Lakes <br />Development", by B.A. Liesch, September 30, 1994 <br /> <br />"Contingency Action Plan, Tract A - Twin Lakes Development", by B.A. Liesch, <br />October 3, 1994 <br /> <br />"Preliminary Excavation Report, Tract A - Twin Lakes Development", by B.A. Liesch, <br />October 17, 1994 <br /> <br />"Creosote Impacted Soils Remedial Action Work Plan for Tract A - Twin Lakes <br />Development", by B.A. Liesch, October 27, 1994 <br /> <br />"Historical Groundwater Investigation Data from Tracts A and B and the Immediate <br />Surrounding Area," by B.A. Liesch, October 27, 1994 <br /> <br />"Groundwater Investigation Work Plan, Tract A - Twin Lakes Development", by B.A. <br />Liesch, October 31, 1994 <br /> <br />Summary of Issues: Remediation activities commenced on October 13, 1995 10 <br />accordance with the previous work documents and associated approvals. <br /> <br />4. Tract B - Arthur Street Extension, B.A. Liesch Associates, March 15, 1995 <br /> <br />Volume I: <br />Volume II: <br /> <br />Volume III: <br /> <br />#24397 <br /> <br />Report and Appendix A, B(report graphics and testing results) <br />Appendix C, D (Soil lab testing data sheets, McCrossan Manifestation and Post Burn <br />Results) <br />Appendix D (Cont.) <br /> <br />44 <br />