My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02880
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:19:15 PM
Creation date
12/8/2004 1:23:31 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2880
Planning Files - Type
Planned Unit Development
Address
2660 CIVIC CENTER DR
Applicant
TWIN LAKES
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Jopke explained the details of the parking standards in the city code. <br /> <br />Tim Kotecki, 3078 Mt. Ridge, asked what is the market occupancy; what is the <br />size of the project; can it be sc:aled down? What is the progress on Twin Lakes <br />Parkway? <br /> <br />Rick Jopke stated the staff USf:S Toll and other market information to determine <br />market trends. Rick Jopke also reviewed the progress of Twin Lakes Parkway. <br /> <br />Terry Moses, 1776 Maple Lane. What makes a new road (the Parkway) help <br />dissipate the traffic? Who owns the Centre Pointe property? Does the city own <br />22 acres? If the city owns thE! property, doesn't that give the city more control <br />over the property? <br /> <br />John Simpson, Mt. Ridge ROcld, asked if Brenner could be blocked off at <br />Cleveland to reduce traffic cut-thru on Brenner? <br /> <br />Nancy Simpson, 3083 Mt. Ridge, asked who is completing the E.A.W,? <br /> <br />Eric Olson, 2001 Brenner, asked why restaurant sites are being advertised? <br />Which parcels does the city have complete ownership of? <br /> <br />Bill Sanden, 3078 Mildred, asked how quickly development will occur on other <br />sites in the Center Pointe pmject? Kent Carlson stated 24-36 months is <br />approximately the time need~~d to complete development. <br /> <br />Dennis Eck, 3082 Mt. Ridge, asked whether Ryan would start with 1 hotel and <br />then determine if another sh()uld be built? Ken Carlson responded that Marriott <br />had done their study to determine that the market is already there. How many <br />rooms are proposed? (185) Are there other similar-size projects in the area? <br /> <br />Roger Jensen clarified the proposal from Woodbridge in comparison to the Ryan <br />proposal. <br /> <br />Mary Reed, Brenner AVenUE!, asked who does the council listen to? Who <br />influences the council? How does the developer know that the hotel will be <br />business oriented? What is light industrial and does this include third shift? <br /> <br />John Savada, 2540 Cleveland, Ramada Inn, asked why are people interested in <br />Centre Pointe? The hotel, to be successful, must be 70% occupied. Savada <br />explained the rates of the h()tels. There are 4 hotels within 3 miles, average <br />occupancy is 65% with $61Jday rate. Neighbors have a right to be concerned <br />with traffic. Roseville does not need another hotel. How long will it take to repay <br />the city's TIF investment? <br /> <br />Will Boelke, 3070 Cleveland, provided a petition to the Planning Commission <br />with 60 signatures opposin~1 the amendment to the Centre Pointe PUD, and <br />asked that the hotel not be allowed on the north side of the site. He-expressed <br />concern with traffic and EA'N across from his house. Property values will decli,ne <br />in this area. <br /> <br />4 <br /> <br />- ---------- <br /> <br />-- <br /> <br />_1_- <br />
The URL can be used to link to this page
Your browser does not support the video tag.