Laserfiche WebLink
<br />D[f~O. <br />.I.~::J <br /> <br /> <br />June 26, 1997 <br /> <br />( <br /> <br />Dan Pellinen <br />Tushie Montgomery Associates, Inc. <br />3300 Edinborough Way #601 <br />Minneapolis, MN 55435 <br /> <br />RE: SANITARY SEWER FLOWS AT CENTRE POINTE <br /> <br />Dear Mr. Pellinen: <br /> <br />The City has had an opportunity to evaluate the existing lift station which serves Centre Pointe <br />and the surrounding area. Of particular concern was the pumping capacity of the lift station as it <br />compares with the anticipated flows from the Centre Pointe development. <br /> <br />The anticipated peak flow to the lift station, based on existing flows and anticipated flows, is 300 <br />gallons per minute. The capacity of the existing lift station is also 300 gallons per minute. <br />Because the anticipated flows do not greatly exceed the lift station capacity, the City will monitor <br />the operations of the lift station and make modifications as necessary in the future. Any required <br />modifications will be completed and funded by the City. <br /> <br />Thank you for your assistance in resolving this issue. If you have any questions or would like to <br />discuss this, please contact me at 490-2221. <br /> <br />Sincerely, <br /> <br />fz:=1 <br /> <br /> <br />Assistant Public Works Director <br /> <br />JK:cy <br /> <br />cc: Duane Schwartz <br />Kim Lee <br />Rick Jopke <br /> <br />2i:': CI\TC CE);TER DRI\"E · R05EVILLE · ~1I~l\'ESOTA · 53n3-1S9LJ <br />612-4GO-:'200 · TDD 612-490-2203 <br />