Laserfiche WebLink
<br />In question 18 of the EA W the statement is made that the predevelopment rate from the Centre Pointe Property is <br />77cIs. Please note that that is incorrect and should read 72 cis. At the time we calculated the proposed 100 year <br />rate for the new Centre Pointe to be about 50 cis. Our latest calculations show ponds 50-56 with a combined rate <br />of 18.2 cis. Street areas not draining to ponds producing 20.2 cis and Centre Point's share of the regional pond to <br />be 11.6 cfs. This totals 50 cis. <br />