My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02882
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:19:54 PM
Creation date
12/8/2004 1:24:50 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2882
Planning Files - Type
Conditional Use Permit
Address
2233 HAMLINE AVE N
Applicant
SPINT PCS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment "A" <br />3/12/97 <br />PF 2882 <br /> <br />Conditions to be attached to be attached to Conditional Use Permit Resolution. <br /> <br />This conditional use permit (CUP) shall be for one communications tower consisting of <br />a 150 foot steel, self supporting telephone tower and equipment cabinets on the <br />southwestern corner of property commonly known as the St. Paul Water Authority - <br />Reservoir site with conditions as follows: <br /> <br />1. The maximum height above grade at the tower base shall be 150 feet. Up to 9 <br />radio/antenna at a size specified in the application, may be installed on the tower. <br /> <br />2. The applicant shall apply for and receive a license/tower permit from the City of <br />Roseville prior to applying for a building permit. <br /> <br />3. All CUP application materials shall be considered part of the permit. The <br />applicant shall apply for and receive a building permit prior to commencing construction. <br />Supporting documents for the building permit shall include a Minnesota registered <br />engineers calculations and certification of structural strength and stability. <br /> <br />4. Approvals in writing from the Water Authority for access over, under, or on the <br />surface of Water Authority property by machinery technicians, and underground wires <br />shall be included in the building permit application. <br /> <br />5. The base of the tower shall be located in an area at least 150 feet from any <br />occupiable structure. <br /> <br />6. All utility wires or lines leading to the equipment panel site shall be buried. <br /> <br />7. The applicant shall adhere to provisions of City Code Section 1012.10, subp. 5 <br />through 7 and 9 through 12, except that paved driveways and parking spaces shall be <br />at the discretion of the City. <br /> <br />8. The proposed steel tower shall be self supporting - no wires or guys are <br />necessary to anchor it. The cellular phone antennas on the tower (up to nine) shall be a <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.