Laserfiche WebLink
<br />Mr. Mike Falk <br />July 27, 1995 <br />Page 4 <br /> <br />the drive aisle, since maneuvering to the concrete pads adjacent to the lift will be difficult, especially <br />if there are vehicles parked in the west parking lot. <br /> <br />Overall, the project appears to have good on-site circulation. The traffic generated is expected to <br />be less than what is currently generated at the Knights of Columbus building by the bingo <br />operation. <br /> <br />If you have any questions, please give me a call at 490-2071. <br /> <br />Sincerely, <br />Short Elliott Hendrickson Inc. <br /> <br /> <br />~~ <br /> <br /> <br />Transportation Planner <br /> <br />tlo <br />Attachments <br />c: Glen Van Wormer, SEH <br /> <br />. <br />