Laserfiche WebLink
<br />9. L,and Use. Describe current and recent past land use and development on the site <br />aJ~d on adjacent lands. Discuss the compatibility of the project with adjacent and <br />ntearby land uses; indicate whether any potential conflicts involve environmental <br />matters. Identify any potential environmental hazard due to past land uses, such as <br />soil contamination or abandoned storage tanks. <br /> <br />T1I1,e Site consists of three parcels: a northern parcel consisting of approximately 8 acres of <br />vacant land; a middle parcel consisting of approximately 12 acres of wooded vacant land; and a <br />southern parcel consisting of approximately 14 one-acre residential lots, 13 of which support <br />homes and associated residential structures. <br /> <br />The northern parcel supported a farmhouse (likely with well and cesspool) and barn with <br />surrounding fields from 1940 to 1959, and a trucking facility (with a well, cesspool, and six <br />wlderground storage tanks for petroleum products) from 1959 to 1982/1983. The trucking <br />facility was demolished and the tanks were removed in 1983. Since demolition of the <br />buildings, the parcel has been vacant, except for some construction debris piles (likely related <br />to demolition of the buildings) and soil stockpiles (placed there by the City of Roseville). <br /> <br />It appears that the middle parcel has always been vacant. During the grading work for <br />construction of the I-35W and Highway 36 interchange in the late 1960s, excess soil from the <br />gI'ading work was reportedly placed in the marshy area of this parcel. Some debris piles (some <br />with a few empty 55-gallon drums) are currently present on this parcel. <br /> <br />Since 1941, the southern parcel has consisted of residential lots. From 1941 to 1964, 13 homes <br />wlere constructed on 14 residential lots. Since most homes were constructed prior to <br />installation of the sewer and water mains, each resident is likely to have had a water well and <br />cesspool or septic tank. <br /> <br />Since the late 1950s and early 1960s, the vicinity of the Site has been developed as a mixed <br />residential and light industrial/commercial area. Surrounding businesses included trucking <br />operations, printing facilities, construction contractors, moving companies, compressed gas <br />distributors, and offices. The proposed development, as a landscaped commercial office park, is <br />compatible with adjacent commercialllight industrial uses. <br /> <br />Underground storage tanks with petroleum products were once present on the northern parcel. <br />Available records indicate that the tanks were removed in 1983. Sampling of soil and perched <br />water at the parcel was conducted by Warzyn Engineering, Inc. in 1990. Except for one <br />dEitection of xylenes in one soil sample (at a concentration well below Minnesota Pollution <br />Control Agency (MPCA) residential screening levels for soil), analytical results did not indicate <br />the presence of petroleum constituents in the soil and water samples. Barr Engineering <br />Company (Barr) sampled soil and perched water at the approximate locations of the former <br />tanks in March 1997. <br /> <br />Tw'o near-surface soil samples in the area of the former trucking facility had diesel range <br />organic compounds at levels (92 and 172 mg/kg) exceeding the MPCA screening level for <br />residential land use. Soils in these areas will be excavated and properly disposed of when the <br />site debris is removed. Tetrachloroethylene and trichloroethylene were detected in a sample <br />from the perched groundwater near the north boundary of the site. These volatile organic <br />compounds may not be a result of former property use. Further investigation will be <br />performed to determine whether information on potential releases to groundwater from <br />ad~acent properties exists. Additional groundwater investigations will be performed if needed. <br /> <br />2362468 \48185-ltrMN <br /> <br />4 <br />