My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02888
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:22:27 PM
Creation date
12/8/2004 1:25:43 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2888
Planning Files - Type
Planned Unit Development
Address
2660 CIVIC CENTER DR
Applicant
GATEWAY BUSINESS PARK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Margaret Knowlton <br />Page 2 <br />September 8, 1997 <br /> <br />Sites with free product (free-floating petroleum), drinking water supply impacts, surface water impacts, indoor vapor <br />impacts, fire or explosion hazards, or ground water impacts which pose a significant threat to public health or the <br />environment, are considered high priority for staff review. If one or more of these situations apply to your site, an <br />RI/CAD report must be submitted within 90 days. In addition, if you know or discover that there is free-product from a <br />well, excavation, or borehole, you must notify the MPCA within 24 hours and IMMEDIA TEL Y begin interim free <br />product recovery. <br /> <br />If you have not already done so, the MPCA recommends that you hire a qualified consulting firm registered with the <br />Petrofund staff that has experience in conducting petroleum release site investigations and in proposing and <br />implementing a.ppropriate corrective actions. A list of registered contractors and consultants is available from the <br />Petrofund staff. The MPCA reserves the right to reject proposed corrective actions if the requirements of the site <br />investigation have not been fulfilled. Please note that, under Minn. R. 2890.0075, subp. 2, you must solicit a minimum <br />of two competitive proposals on a form prescribed by the Petro Board to ensure that the consulting costs are reasonable. <br />Questions about bidding requirements should be directed to Petrofund staff. <br /> <br />Required Response <br /> <br />MPCA staff requests a response to this letter within 30 days. Please tell us whether you intend to proceed with the <br />requested work. If you do not respond within this time frame, the MPCA staff will assume that you do not intend to <br />comply, in whic~h case the MPCA Commissioner may order you to take corrective action. Failure to cooperate with the <br />MPCA in a timely manner may result in reduced reimbursement from the Petro Board. See Minn. R. 2890.0065, subp. <br />I, item C. The: enclosed fact sheets will provide you with the information necessary to complete a successful <br />investigation and cleanup. If you have any questions concerning Illis letter or need additional information, please contact <br />me at 612/297-:8580. Please reference the above LEAK # in all correspondence. If you are calling long distance, you <br />may reach the MPCA St. Paul Office, by calling 1/800-657-3864. <br /> <br />Sincerely, <br />// . M/J(j) <br />}6i' -;(\. -It~r" <br />J . <br />Chris L. McLain <br />Project Manag(:r <br />Cleanup Unit I <br />Tanks and Eme:rgency Response Section <br /> <br />CLM:raf <br /> <br />Enclosures <br /> <br />cc: . Ri~baidl:otlite;~_tEhi.di~lle'f <br />Larry Carlson, Ramsey County Solid Waste Officer <br />Gary Schroeher, Delta Environmental, Roseville <br />
The URL can be used to link to this page
Your browser does not support the video tag.