My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02890
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:23:39 PM
Creation date
12/8/2004 1:29:11 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2890
Planning Files - Type
Interim Use Permit
Address
2660 CIVIC CENTER DR
Applicant
NSP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C. There are no additional costs added to the site that would deter a <br />permanent use at a later time. <br /> <br />M STAFF RECOMMENDATION <br /> <br />5.1 Staff recommends approval of the NSP/Ramsey County grinder interim use <br />permit with the following conditions: <br /> <br />A. The number of days of use shall not exceed twelve times per year, nor <br />more than two days in any month. Hours for grinding, loading, and <br />hauling of chips shall be 7:00 a.m. to 6:00 p.m. weekdays only. When <br />not in operation the site shall be gated. <br />B. Wood stockpiles shall be a maximum of ten feet in height and sit no <br />longer than 120 days. <br />C. Chip stockpiles shall be a maximum of ten feet in height. <br />D. The applicant shall supply the city with a letter from the Minnesota <br />Pollution Control Agency stating that the noise levels of the grinding <br />machinery, carrying belts, loading and hauling equipment, (when all <br />are in operation), do not exceed MnPLA noise standards, or are <br />exempt from such standards. <br />E. The City and its residents may dispose of limbs at the site at times, <br />(at least two times per year), designated by NSP and approved by <br />the City. <br />F. The permit shall be reviewed annually in August prior to renewal of the <br />County/NSP agreement in September of each year. <br /> <br />6.0 SUGGESTED ACTION <br /> <br />6.1 By motion, determine that the site is secured in off hours; that the limited noise <br />(assuming compliance with MnPCA standards) and piling are not considered a public <br />nuisance or health hazard; and that there will be no additional cost added to the site <br />that would deter a permenant use of the site. <br /> <br />6.2 By motion, recommend approval of the NSP/Ramsey County grinding operation <br />with the following interim use conditions: <br /> <br />A. The number of days of use shall not exceed twelve times per year, nor <br />more than two day in any month. Hours for grinding, loading, and <br />hauling of chips shall be 7:00 a.m. to 6:00 p.m. weekdays only. When <br />not in operation the site shall be gated. <br />B. Wood stockpiles shall be a maximum of ten feet in height and sit no <br />longer than 120 days. . <br />C. Chip stockpiles shall be a maximum of ten feet in height. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.