My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02929
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2900
>
pf_02929
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:24:17 PM
Creation date
12/8/2004 1:53:28 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2929
Planning Files - Type
Conditional Use Permit
Address
2582 LONG LAKE RD
Applicant
CB COMMERCIAL
PIN
082923110012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4.1 Based on the findings outlined in Section 3.1 of this report, staff recommends <br />approval of the request for a conditional use permit to allow the placement of a <br />commercial communications tower on a non-City tower site at 2582 Long Lake <br />Road, with the following conditions: <br /> <br />1. The applicant must demonstrate the service area for the proposed antenna <br />in this location versus a City tower site. <br /> <br />2. The applicant must demonstrate why it is not technically feasible to meet the <br />requirements of the code and integrate such antennas or add them to an <br />existing cellular or water tower. <br /> <br />3. The applicant must provide space for up to three additional users on the <br />proposed tower or demonstrate why it is not technically feasible to do so. <br /> <br />4. The monopole must be setback a minimum of 30 feet the east property line <br />and a minimum of ten feet from the south property line. <br /> <br />5. The monopole must be removed by the owner within twelve months after it <br />is no longer in use. A bond may be required from the owner by the city to <br />assure that the tower is removed within twelve months. <br /> <br />~o SUGGESTED ACTION <br /> <br />6.1 By motion, recommend approval of the conditional use permit to allow the <br />placement of a commercial communications tower on a non-City tower site at 2582 <br />Long Lake Road, based on the findings outlined in Section 3.1 of this report and <br />with the conditions outlined in Section 4.1 of this report. <br /> <br />Attachments: location map; notification map; notice of public hearing; site plan; elevation of monopole; <br />photograph of similar monopole; service coverage maps with and without this site; non feasibility study for City <br />tower site; description of CDMA technology; and photographs of property. <br /> <br />60-clay Time Limit: application submitted on June 9, 1997; application accepted as complete on June 19, <br />1997; decision deadline is August 18, 1997. <br /> <br />Prepared by: Kim L. Lee, AICP (490-2236) <br />M:\RPCA\PF2929.PCA <br /> <br />PF#2929 - RPCA (07/09/97) - Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.