Laserfiche WebLink
<br /> 4. Commercial receiving or transmitting antelmas and towers not <br /> located on a City tower site shall be a conditional use. Commercial <br />---- receiving or transmitting attenas and towers may only be located in <br /> "B" Business or "I" Industrial districts. The City may establish <br /> permit review periods, tower termination, time limits or an <br /> amoritization schedule specifying the year in which the tower shall be <br /> taken down by the applicant or assign. A performance bond or other <br /> surety may be required by the City in order to assure removal of the <br /> tower at a specific date. <br /> 5. The applicant shall present documentation of the possession of any <br /> required license by any Federal, State or local agency. <br /> 6. All antennas and towers and support structures including guy wires <br /> and foundations shall be subject to the appropriate requirements of <br /> Section 1012.1 OA8 and the setback requirements established for <br /> accessory structures in the applicable zoning district. Antennas, <br /> towers, guy wires and foundations, and support buildings shall be <br /> constructed on one (1) lot or parcel and shall be set back a minimum <br /> of thirty feet (30') from any front property line. <br />'-.-- <br /> 7. All antennas and towers shall be designed and screened as visu'ally <br /> appropriate, shall utilize a City approved gray or blue color, and shall <br /> contain no signage, including logos, except as may be required by <br /> any State or Federal regulations. <br /> 8. Existing transmitting and receiving facilities at the time of the <br /> adoption of this Section may remain in service. However, at such <br /> time as any material change is made in the facilities, full compliance <br /> with this section shall be required. No transmitting or receiving <br /> antennas or towers may be added to existing nonconforming <br /> facilities. Towers and receiving facilities shall be dismantled and <br /> removed from the site within 1 year after abandonment of the use of <br /> the tower or facility for communication purposes. <br /> 9. Security fencing for antennas and towers may include chain link and <br /> barbed wire to a total height of eight (8') feet above grade. <br /> 3 <br />----- <br />