Laserfiche WebLink
<br />~t..C> &/1 / ll&NtJln~ <br /> <br />Construction Costs Exhibit-3-19-99 <br /> <br />Asphalt &; Base S 22,800.00 <br />Excavation and Concrete $ S 1,214.00 <br />Lighting S 2,800.00 <br />Retaining Wall $ 12,937.50 <br />l.and~ing $ 1,440.00 <br />Irrigation $ 1,900.00 <br />Site Survey $ 2,637.00 <br />Permits $ 1,150.00 <br />Sub-Total $ 96,878.50 <br />Contractor Profit &; Overhead <br />8% $ 7,750.28 <br />ArchitectuIal $ 19,710.79 <br />Engineering $ 3,788.65 <br />Soil Tests $ 297.25 <br />Retaining Wall Chain Link Fence $ 967.00 <br />Sub-Total $ 32,!13.97 <br />Total $129,391.47 <br /> <br />C,J"", ~ <br />