Laserfiche WebLink
<br />The walkthrough asbestos inspection identified seven possible <br />asbestos containing materials in the building. Two of these <br />materials were found to be damaged. Based on these findings, !1 <br />is Northern Environ~t't't''''''!::. opinisR 't'ht'lt a more comprehens1:Ve <br />. . ould be completed on the building. The <br />results of this inspection w 'emediation <br />plan and cost estimates to be prepared. <br /> <br />Lastly, inactive or abandoned water t.r911c::. can become cond,uits for <br />vertical migrstion of contaminants and should, therefore, be <br />properly sealed when no longer ill \:l!!e. <br /> <br />The results of this study are based upon professional <br />interpretation of the information available to Northern <br />Environmental given the time and budget restraints of this <br />project. Northern Environmental has assumed that the information <br />provided by the cited references is complete and correct. <br />Northern Environmental does not warrant that this report <br />represents an exhaustive study of all possible environmental <br />impacts. However, the items investigated as part of this study <br />do represent the most likely sources of environmental impacts, <br />and are consequently believed to adequately address potential <br />impacts to soil and ground water at the site. <br /> <br />We trust this information meets your needs. If you have any <br />questions or comments concerning this report, please feel free to <br />contact us. <br /> <br />Sincerely, <br />Northern Environmental <br />Technologies, Incorporated <br /> <br />~=J&~ <br /> <br />Project Manager <br /> <br />~~,.e~ <br /> <br />Bruce Rehwaldt, P.E. <br />Director of Operations <br />