Laserfiche WebLink
<br />. @) Bay west <br /> <br />Mr. Rehwaldt <br />January 22, 1991 <br />Page 2 <br /> <br />Damaged t~erm~l systems insulat~on on piping and de~ris were . . <br />observed 1n p1petunnels. No eV1dence of encapsulat1onof'the <br />suspect materials was observed. It was not determined during the <br />walkthrough if the tunnel was part of the ventilation.system. <br /> <br />RECOMKENDAT:IONS <br /> <br />1. <br /> <br />If a building <br />comprehensive <br />management of <br /> <br />inspection has not been done, <br />inspection would be the first <br />asbestos-containirig materials <br />4. \ . , ~ <br /> <br />Existi~g building inspection reports (if any) should be <br />reviewed to determine that they are up to date with res~ect <br />to asbestos-containing materials and their conditions w1thin <br />the building. <br /> <br />Persons entering the pi~e tunnels should be e9Uipped with <br />proper personal protect1ve equipment to minim1ze potential <br />exposure to asbestos fibers. <br /> <br />conducting a <br />step in <br />at the facility. <br /> <br />2. <br /> <br />3. <br /> <br />." , <br />. - <br />4. Remediation of damaged pipe ~nsulation (assumed to be <br />asbestos) in the tunnels would be a top priority if an <br />asbestos ,management plan were implemented. <br /> <br />5. Any other suspect materials should be assumed to contain <br />asbestos and care should betaken to avoid disturbJng or <br />damaging them. <br /> <br />/' <br /> <br />( <br />Please contact me at 612-291-0456 if you ~ave any questions <br />regarding this report. <br /> <br />;:;~elY'.ra . <br /> <br />Mark Sona lia . <br />Industria Hygiene Technician <br /> <br />,. . <br /> <br />2012 <br />