My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02982
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2900
>
pf_02982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:27:27 PM
Creation date
12/8/2004 1:56:37 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2982
Planning Files - Type
Conditional Use Permit
Address
2075 SNELLING AVE N
Applicant
MCDONALDS RESTAURANT
PIN
162923110007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~1/27/98 <br /> <br />09:08 <br /> <br />'8'612 885 4769 <br /> <br />IaJ 002 <br /> <br />~[cDONALD 'S CORP. <br /> <br />January 26. 1998 <br /> <br />SUbject: <br /> <br />MoDonald's Restaurant <br />2075 Snelling Avenue North <br />Roseville. MN 55113 <br /> <br />To Our Neighbors: <br /> <br />McDonald's Corporation is planning to re-build the McDonald's In Rosevllle. The <br />original restaurant at this site, the first to open in Minnesota, was built in 1957 <br />and subsequently replaced by the existing restaurant in 1971. <br /> <br />While the nature of the business will remain unchanged, there will be numerous <br />improvements to the existing operation. The major change is the new building <br />which is proposed with an indoor playptace and a Softplay apparatus with <br />seating for 60. The main restaurant will seat 70 for a total of 130 seats. The <br />existing outdoor playland will be removed. <br /> <br />The building exterior will utilize a combinatIon of glass, stucco. and brick. There <br />will also be upgrades to the existing site lighting and landscaping, improvements <br />to drive-aisle widths, and drive-thru ordenng convenience. Additionally, the site <br />will be screened from the housing to the west, and all trash 1acilities will be fully <br />enclosed. <br /> <br />The length of time required for this project is approximately 75 days staning earty <br />April, 199B. The restaurant will be closed during rSMconstruction. A McDonald's <br />representative will be at the restaurant on February 10, 1998 from 2:00 - 4:00 <br />PM to answer any questions or hear comments. You may also contact me at <br />(612)884-4355. <br /> <br />Sincerely. <br /> <br />~~~ <br /> <br />Craig Bame( : <br />Construction Department M~nager <br />McDonald's Corporation <br /> <br />corm.tI8meSltoSElYllle3.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.