Laserfiche WebLink
<br />must be reviewed and approved by the Director of Public Works prior to any pennits being <br />issued for these projects. <br /> <br />8. 3 Erosion Control. Prior to site grading, and before any utility construction is commenced or <br />building penn its are issued, an erosion control plan must be submitted for approval, and all <br />erosion control actions shall be implemented, inspected and approved by the CITY. <br /> <br />8.4 Clean Up. The DEVELOPER shall clean dirt and debris from streets that has resulted from <br />construction work by the DEVELOPER, its agents or assigns. The CITY will detennine <br />whether it is necessary to take additional measures to clean dirt and debris from the streets. <br />After 24 hours verbal notice to the developer, the CITY may complete, or contract to <br />complete the clean up at the DEVELOPER'S expense. <br /> <br />8,5 Street Trees. CITY policy requires the planting of street trees in conjunction with <br />development or redevelopment throughout the community. The DEVELOPER shall install <br />street trees in accordance with the City's Street Tree Master Plan (as provided and approved <br />by the CITY'S Landscape Architect) adjacent to both properties. <br /> <br />8.6 Pedestrian Walkways. CITY policy requires the installation and/or replacement of pedestrian <br />pathways (sidewalks), no less than six feet in width, within the public right-of-way in <br />conjunction with commercial development. The DEVELOPER shall install pedestrian <br />pathways along Cleveland A venue on both parcels or make a payment in lieu of pathway <br />construction, in the amount of $15 per lineal foot (lot frontage less curb cuts), at the <br />discretion of the Director of Public Works. The Director of Public Works has approved a <br />payment in lieu of construction for this project. The estimated payment in lieu for parcel A <br />is $ . The estimated payment in lieu for parcel B is $ . The <br />DEVELOPER shall pay to the CITY" the pathway payment in lieu of construction" at the <br />same time that the building penn it for the primary structure building penn it is paid for on <br />each parcel. <br /> <br />9, PUD Standards/Conditions of Approval <br /> <br />To insure that the proposed development meets the CITY'S standards for the approval of a PUD, <br />as set forth in Section 1008 and 1015 of the Roseville City Code, the Development shall also comply <br />with the following specific PUD standards: <br /> <br />9, I General Development Standards. The certificate of survey, site development plan, landscape <br />plan, grading and utility plan, building elevations (southern parcel), development schedule, <br />and final land use designations shall be part of the standards for development of the Charles <br />Cabinet PUD. <br /> <br />9,2 Uses - General. The use of property within the PUD shall be limited to the proposed 10.000 <br />square foot (approximate) office/showroom/cabinet manufacturing facility on the southern <br />parcel and a single-family dwelling on the northern parcel, and shall be restricted to the <br />parameters specified in the site development/landscape plan, building elevations, and <br />supporting documents submitted by the DEVELOPER. Where not superseded by more <br /> <br />PUD Agreement #_ (Charles Cabinet) - Page 4 of 10 <br />