Laserfiche WebLink
<br />. <br />t <br />. <br />t <br />. <br />>> <br />t <br />t <br />t <br />>> <br />>> <br />>> <br />>> <br />>> <br />>> <br />>> <br />. <br />. <br />. <br />. <br />. <br />>> <br />>> <br />>> <br />. <br />>> <br />. <br />. <br />>> <br />. <br />. <br /> <br />III. Framework Plan <br /> <br />it would not provide smoom traffic Rowand might not relieve Councy Road C. <br />Following is a summary of me issues and the recommendations from this <br />cva.luation: <br /> <br />1. Interchange Option A - Existing. One option would be [0 leave the <br />interchange exactly as it is. In the existing configuration the on- and <br />off-ramps are located approximately 600' north ofCouncy Road C and the <br />interchange includcs a separate off-ramp which merges with west-bound <br />traffic on County Road C. This additional off-ramp loop presents a certain <br />amount of problems, since drivers c::x.iting &om I-35W have [0 make a <br />quick decision regarding which exit to take - the one to Cleveland Avc:nUl: <br />or the one to west-bound County Road C. This indecision can result in <br />accidents and/or back-ups on I-35W. <br /> <br />In this option, the Twin Lakes Parkway could be connected directly [0 the <br />I-35W ramps, which would require the acquisition of the Cummins <br />property. or the Parkway connection could be offset, which is not desirable <br />from a traffic circulation standpoint. <br /> <br />2. Interchange Option B - Ramp Reconfiguration. In Option B. the: 1-35W <br />on- and off-ramps would remain in their current location, but the loop. [0 <br />wcst-bound County Road C would be removed. Instead, an acra <br />south-bound lane would be added to Cleveland Avenue and a free: <br />right-curn would be provided for south-bound traffic to west-bound <br />Couney Road C. This re:configuration should improve the overall craffic <br />circulation by removing the indecision poinr and by giving all c::x.iting <br />drivers the: option [0 go either cast or west on Couney Road C. The <br />choices for connecting Twin Lakes Parkway are the same as in Option A. <br /> <br />3. Interchange Option C - Minor Ramp Relocation. In Option C, the: <br />1-35W on- and off-ramps would be: relocated anywhe:re from 100' to 200' <br />to the north. This would permit a direct connection of Twin Lakes <br />Parkway to the I-35W ramps without requiring the acquisition of the: <br />Cummins property, but it would require the acquisition of the Xtra <br />Leasing property. However, this option would add considerable: cost for <br />the relocation of the: ramps and it would create substantial impacts on the <br />existing wetlands north of the ramps. Preliminary conceptual cost <br />estimatcs indicate that the: reconstruction of the ramps and improvements <br />to Cleveland Avenue: could total up to $1,000,000. <br /> <br />Twin UUts Parlrw/l] Mast" Plan <br /> <br />10 <br />