Laserfiche WebLink
<br />4.3 The City tax abatement is proposed as follows: <br />1. The City would abate 'Yz of the additional City taxes (County and School District <br />retain 100 % of the increase) generated by the improvement for a total of ten <br />years (maximum allowed by State Statute). The City would collect the remaining <br />half of the tax increase on the improvement and the full amount after 10 years. <br />2. The abatement would be cancelled if the home were sold anytime within the ten <br />years. <br /> <br />4.4 There are several benefits provided to the homeowner and the City through a City loan <br />and partial tax abatement amendment under the Rambler Redesign Program. <br />1. It is estimated (see attached table) that over a twenty-five year period, the City <br />would recover approximately fifty-three percent of a $20,000, zero percent <br />interest loan in new taxes (even with the rebate). In addition, at least 50 percent <br />of the loan amount would be collected in loan repayments in years 11-20. The <br />increase in the taxes plus the loan repayment combined, over a twenty-five year <br />period, would result in a 103 percent return on investment to the City if the <br />homeowner remains in the home for more than 20 years. If the home were sold <br />before year 20, the increase in the taxes plus the full repayment of the loan <br />combined would result in a 150 percent return over a 2S-year period. <br />2. The City loan repayments can be filtered back into the Housing Fund to support <br />additional home improvement loans. <br />3. The City would recover the entire principal amount of the loan if the homeowner <br />sells before 20 years. <br />4. The improved home contributes to the City's housing goals and continues to <br />generate increased taxes while strengthening the quality and livability of the <br />neighborhood. <br />S. As homes are improved under the program, there will be an increase in housing <br />choices for families. Providing up to date housing for families would, at a <br />minimum, sustain and likely increase the school population, adding per pupil <br />revenue to the schools. The Council may choose to direct staff to discuss <br />partnerships with the School District under the partial abatement portion of the <br />program. This would be an additional incentive to the homeowner to implement <br />a project as the School District tax contribution is close to 50 percent. <br />6. All other elements of the Rambler Redesign Program would need to be met to <br />qualify for the deferred loan and partial abatement. <br />. Qualified or experienced architects\home designers must provide design <br />advice and plans for the improvements. <br />. Improvements must include increasing the functionality of the home such as <br />enlarged and improved kitchen, additional or enlarged bathroom, master <br />bedroom addition, main floor family room, second garage stall, exterior entry <br />appeal. <br />. The city must be permitted to publicize the improvement with a video and <br />open house in addition to keeping a copy of the plans and drawings for <br />publication as part of a remodeling book. <br /> <br />RCA - Rambler Redesign 07/27/98 - Page 3 of 4 <br />