Laserfiche WebLink
<br />13. Site drainage shall be accommodated on the site so that water is directed away from the <br />new home and the neighborhood properties. The builder must comply with any federal, <br />state or local drainage requirements. Construction of the finished structure must not <br />have a detrimental impact on storm water drainage patterns on the adjoining <br />properties. Roof gutters will be required. <br /> <br />14. Soil condition should be verified to assure that the quality of the soil can handle the new <br />constructed home. If modifications are required, proper documentation must be <br />submitted. <br /> <br />15. All air conditioning units must be located in the rear yard of the house. <br /> <br />16. Utility meters shall be screened from street view with locations identified on the plans. <br /> <br />17. The neighboring property and adjacent public streets shall be kept free of construction <br />debris at all times. The construction site shall be maintained so not to become a <br />nuisance. Under no circumstance during the construction period shall construction <br />workers, construction equipment or construction materials enter, disturb, or damage <br />neighboring properties. <br /> <br />Q:\Housing\Replacement Program\HRP criteria - attachment A.doc <br /> <br />.. '...... <br /> <br />()vJ-CA-- J : <br />p&( f.r;C iscu..L, <br />P~d t~~ <br />/33:; &1v~ k( <br />&to ~ Iiu.l/ 1J1j/ <br />t:J)Z/ 3-:z <br />DCUVUJ L lJ-JMh~ <br />f.f I~ fu7 -I ( ( I <br />