My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03073
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3000
>
pf_03073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:31:56 PM
Creation date
12/8/2004 2:48:59 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3073
Planning Files - Type
Conditional Use Permit
Address
2785 HAMLINE AVE N
Applicant
SUPERAMERICA
PIN
032923310025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-'?-} Sr-cfq <br /> <br />ATTACHMENT TO THE APPLICATION OF SPEEDWAY SUPERAMERICA LLC <br />TO REBUILD THE PRESENT SUPERAMERICA STORE AT 2785 HAMLlNE <br /> <br />Speedway SuperAmerica LLC proposes to demolish the present store on this site and <br />build a new SuperAmerica store on the same site. Sheet SDP overlays the proposed <br />new stofe plan on the present development of the site. The new store will have a <br />gross area of 2867 sf and a net retail area of 1706 sf. This is slightly larger than the <br />present store with 2014 gross sf and a net retail area of 1236 sf. The design and <br />placement of this store was developed to permit successful and compatible rebuilding <br />on existing sites that could not expanded. An example of this store design is located at <br />Lexington and FrontJEnergy Park Drive in St. Paul. Photos of another S1. Paul site with <br />this same design at Snelling and Ford Parkway have been provided to staff. Please <br />note we are proposing to use the lighter colored brick of Lexington and Front, not the <br />darker brick in the photos, at this site. <br /> <br />The placement of the building in the corner of the site allows the creation of a diagonal <br />traffic flow through the site, allowing two drives to serve the site, and others to be <br />closed. This also masses the open space at a front corner, achieving a significant <br />green space on these always tight sites. The scheme is reinforced physically and <br />visually by the diagonal face of the building. We recognize this may require <br />exceptions to some setback requirements that typically tend to "center" the building on <br />the site, but as this has proven a very successful design where it has been <br />implemented, and request its approval, especially given the directly adjacent parking <br />lots and driveway uses. <br /> <br />The new store will be a candidate for 24 hour operation. <br /> <br />At restricted sites we have had success with the dual use parking proposed along the <br />west edge. Parking as proposed is the closest to the entrance of the store and has <br />simply not been an interference with the twice weekly trash pick ups and the delivery <br />once every two to three days of fuel to the underground tanks. Our experience is this <br />is not a practical problem. The parking provided on site, including the parking at the <br />pump islands, is in excess of our observed peak hour demand. <br /> <br />We are replacing the present nonconforming pylon sign with a monument type sign, <br />but are requesting a vertical, rather than horizontal format. The vertical format works <br />better with the planting we have proposed and is mitigated by the reduced sign area <br />and the inside boulevard along Hamline. <br /> <br />March 15, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.