My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03077
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3000
>
pf_03077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:32:35 PM
Creation date
12/8/2004 3:01:31 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3077
Planning Files - Type
Planned Unit Development
Address
1944 LEXINGTON AVE N
Applicant
OLSON, JOHN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR COUNCIL DISCUSSION and DIRECTION <br /> <br /> <br />Manager Approval: <br /> <br />DATE: 04/19/99 <br />ITEM NO: <br /> <br />Agenda Section: <br /> <br />Item Description: John and Lois Olson Cryogenic Lab Renovation Project <br /> <br />Background: <br /> <br />Cryogenic Labs, located at 1940 Lexington, is midway through the concept PUD stage, <br />having received a positive recommendation from the Planning Commission on April 14, <br />1999. John and Lois Olson are requesting further feedback and suggested improvements <br />before submitting the proposal for a concept PUD decision to the Council. <br /> <br />John and Lois Olson have met with the Council in the past on the concept for the <br />Cryogenic Labs. Since the sketch plan reviews with the Council the Olsons have prepared <br />concept plans and met with the neighbors and the Planning Commission (2 public <br />hearings), the last being April 14, 1999. Mr. Olson notes that the four adjacent property <br />owners have shown interest and confidence in the proposal. Mr. Olson notes that Dave <br />Johnson is still very interested in extending the front fa<;ade improvements to include the <br />hardware store. (Staff did check with Dave Johnson on his imrpovements - he is <br />scheduled to begin construction and landscaping around May 15 or earlier.) <br /> <br />A series of improvements to their original designs have included larger setbacks, revised <br />architecture along the east wall, reduced height of the entry tower and screening of the <br />light within the entry tower from residences to the east and north. A separation between <br />buildings has been added to allow air movement and visibility the town homeowners <br />requested. The delivery and lab tank storage areas are now completely screened with an <br />extended building wall. New fencing is now proposed along the north property line and <br />more landscaping and/or retaining walls are to be added. Parking spaces were redesigned. <br /> <br />The back round report from the Planning Commission meeting is attached, <br /> <br />Reauested Action: <br /> <br />Provide comment and direction. <br /> <br />Q:\Planning Files\3077\CounciIReport(041999),doc <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.