My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03082
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3000
>
pf_03082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2009 4:13:27 PM
Creation date
12/8/2004 3:02:27 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3082
Planning Files - Type
Comprehensive Plan Amendment
Address
2660 CIVIC CENTER DR
Applicant
CITY OF ROSEVILLE
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Request for Planning Commission Action <br /> <br />Date: 12/09/98 <br />Item No: 6(C) <br /> <br />Department Approval: Manager Approval: Agenda Section: <br />~ Public Hearings <br /> <br />Item Description: Adoption of Annual (1998) Comprehensive Plan Revisions (Pf3082) <br /> <br />1.0 Background <br /> <br />1.1 Each year in December/January the Roseville Planning Commission and City Council <br />affirm the Comprehensive Plan changes that have occurred during the previous year. (The <br />Comprehensive Plan was rewritten and adopted in September 1994.) During the year, <br />public hearings are held on all plan changes before they are approved by the Commission <br />and Council. Most amendments (see examples below) are then sent to the Metropolitan <br />Council for their review, comment, and approval. <br /> <br />1.2 In order to keep track of amendments to the Plan, the Planning Commission has, annually, <br />scheduled the affirmation of the changes and inclusion of the changes on an addenda <br />sheet in the front of the plan. This has been a unique year, in that the Commission and <br />Council completed its plan affirmation stage in January, and now will resubmit the Plan <br />(with updated statistics and/or rewritten text) in late 1998 for the Metro Area Mandatory <br />Plan Review by the Metropolitan Council. No goals or policies have changed. <br /> <br />2.0 COMPREHENSIVE PLAN REVISIONS - A chart of the entire plan, sections, and <br />appendices is now incorporated in the front of the Plan. <br /> <br />2.1 Demographics (Section 2) - The demographic profile has been updated where statistics <br />are available. <br /> <br />2.2 Existing Land Use Map(Section 4) - Illustrates existing land uses, including a spreadsheet <br />breakdown of each designation by area and percent of total City land area. <br /> <br />2.3 Comprehensive Plan Future Land Use Map (Section 4) - Illustrates all future land use <br />designations based on City approvals to December 14, 1998, including a spreadsheet <br />breakdown of each designation by area and percent of total city land area. <br /> <br />PF 3082 - RPCA (12/09/98) - Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.