Laserfiche WebLink
<br />REQUEST FOR PLANNING COMMISSION ACTION <br /> <br />DATE: 3/1 0/99 <br />ITEM NO: 6 (a) <br /> <br /> <br />Agenda Section: <br />PUBLIC HEARINGS <br /> <br />Bradley Operating Limited Partnership (for Cub Foods) request for vacation <br />of a portion of certain utility and drainage easements in connection with the <br />rerouting of utility lines located on the southeast side of the former <br />Homeplace, in Har Mar Mall at 2100 Snelling Avenue. (PF31 04). <br /> <br />1.0 Requested Action <br /> <br />Manager Approved: <br /> <br />1.1 Bradley Operating Limiting Partnership is requesting the vacation of certain utility and <br />drainage easements located southeast of the former Homeplace structure in Har Mar Mall <br />(legal description attached). <br /> <br />2.0 Background <br /> <br />2.1 This specific request by Bradley Operating Limited Partnership is based on their future plans <br />to redevelop the former Homeplace site with a 75,000 + square foot Cub Food grocery store. <br />The proposal calls for a new utility easement to be established directly adjacent the current <br />easement and for the existing utilities to be reconstructed within said new easement. Based <br />on the proposed plan and the provision of a utility easement prior to the relocation of utilities <br />the specific easement area identified on the attachment is no longer necessary. <br /> <br />2.2 Section 1013.04 outlines the procedure for vacating streets, alleys, and easements. A public <br />hearing is required. The Planning Commission holds the hearing and recommends a vacation <br />action to the City Council. <br /> <br />3.0 Staff Comment <br /> <br />3.1 In reviewing this request, staff made the following findings: <br /> <br />The Roseville Engineering Department has reviewed and provided comments to Westwood <br />Professional Services regarding the proposed design of relocated utilities. It has also <br />determined that the proposed easement is adequate to accommodate the reconstruction of the <br />existing utilities. The Engineering Department continues to work with Westwood <br />Professional Services on an acceptable utility design that meets City requirements. <br /> <br />4.0 Staff Recommendation <br /> <br />4.1 Based on the findings outlined in Section 3.1 of this report, staff recommends approval of <br />the request for vacation of utility and drainage easements located on the southeast side of the <br />former Homeplace facility in Har Mar Mall, 2100 Snelling Avenue and recommend <br /> <br />PF3104 - RPCA (3/10/99) - Page 1 of 2 <br /> <br />.' C}; \ {} C\,~ <br />